4
days after the delivery date. If the damages are found after this time, the manufacturer will not be
responsible.
INSTALLATION OVERVIEW
This manual will walk you through the installation of the scoreboard. While care has been
taken to consider the many scenarios for installation, some general information applies to all. Use this
guide as closely as possible to ensure proper installation, as follows:
1. Review the product specifications below to determine your specific installation hardware.
2. Mount the scoreboard to the wall or suspend it from a ceiling structure.
3. Install the electrical service for the scoreboard and the controller.
4. Install the control cable for cable-controlled systems. No additional installation is necessary
for Wireless Remote Control systems.
5. Install any options, such as sponsor panels or protective nets, according to the installation
instructions included with each option package.
6. Test the installed system.
PRODUCT SPECIFICATIONS
Overall Dimensions:
8’-0” tall x 24’-0” long x 8” deep, shipped in six (6) sections
Weight:
Hanging weight approx. 1510 lbs.
Shipping weight approx. 1560 lbs.
Mounting Requirements:
(3) 8” steel I-beams (W8 X 31), or (3) 8” OD galvanized steel poles (schedule 40)
Power Requirements:
Scoreboard:
•
1 - 120-volt, 20-amp, 60 Hz grounded AC circuit. Ideally, this will be a dedicated circuit.
•
Access must be provided to turn off the power to the scoreboard after each use. Failure
to turn off the power to the scoreboard could affect the functionality of the scoreboard;
such as from a power surge or lightning strike.
•
It is important to utilize the equipment ground inside the scoreboard cabinet at the utility
box provided for the AC power connection.
Keyboard controller:
•
1 - 120-volt, 15-amp, 60 Hz grounded AC circuit - standard wall receptacle.