ProStar 325 UV-Vis Detector Control Manual
-
21 -
03-914947-44:2
Starting and Viewing an
Acquisition
Quick Start and Sequence
Once the instrument control method has been correctly
programmed, an analysis can be started. The next section
briefly describes how to start an acquisition.
Quick Start (Single Acquisition)
1. Press
the
button.
In the
Quick Start
window, select the system, the method
and optionally the project if connected in "All project" mode.
2. Press
the
OK
button.