Revision: 4
Date:
09/08/20
RV-12iS Flight Training Supplement
4-22
RIGHT MAIN LANDING GEAR
•
Tire
– CONDITION, proper inflation 25psi
•
Brake
– CHECK condition, NO leakage
•
Axle Nut
– CHECK cotter pin installation
•
Wheel Bearings
– SHAKE top of tire left and right
•
Wheel Pant (If Installed)
– CONDITION CHECK
•
Wheel Chocks
– REMOVE
Summary of Contents for RV 12iS
Page 1: ...Revision 4 Date 09 08 20 RV 12iS Flight Training Supplement i FLIGHT TRAINING SUPPLEMENT...
Page 14: ...Revision 4 Date 09 08 20 RV 12iS Flight Training Supplement 4 2...
Page 15: ...Revision 4 Date 09 08 20 RV 12iS Flight Training Supplement 4 3...
Page 50: ...Revision 4 Date 09 08 20 RV 12iS Flight Training Supplement 6 2 ELECTRICAL SWITCHES KNOBS...
Page 56: ...Revision 4 Date 09 08 20 RV 12iS Flight Training Supplement 6 8...
Page 89: ...Revision 4 Date 09 08 20 RV 12iS Flight Training Supplement REAR COVER...