Pre- Installation
1. Review your packing list and make sure you have received all the parts before beginning installation.
2. If you are going to be turning off the water to the house and you have an electric water heater, shut off the
power to the water heater before beginning installation in case water heater is accidentally drained.
3. Pick a suitable location for your filter system on a dry level spot where it won’t be exposed to freezing
temperatures. A minimum of 20 PSI is required. Maximum pressure is 90 PSI.
4. Get all of your plumbing parts together before beginning installation. After installation the WS1 filter must be
allowed to run through a complete backwash and rinse cycle (also called ‘regeneration’). This takes about 90
minutes.
5. After the system is installed and running, your water may be discolored, or full of sediment or rust, if you have
older piping that has been exposed to sediment, iron or manganese for sometime. Typically this clears up over a
day or two.
C0710-PVC – ¾” x 1” PVC Solvent 90
⁰
Assembly
No. Part No. Description
Qty.
1
C3151
Nut 1” Quick Connect
2
2
C3150
Split Ring
2
3
C3106
O‐Ring 216
2
4
C3189
Fitting ¾”x1” PVC Solvent 90⁰
2
C10-PVC – 1” PVC Male NPT Elbow Assembly
No. Part No. Description
Qty.
1
C3151
Nut 1” Quick Connect
2
2
C3150
Split Ring
2
3
C3106
O‐Ring 216
2
4
C3149
Fixing ¾”x1” Male NPT Elbow
2
Summary of Contents for Clack WS1
Page 4: ......