Valtir.com
17
Revision F August 2022
3) Clean the Boreholes
Blow the concrete dust from the borehole using oil-free compressed air. Thoroughly brush it
with a 7/8” diameter steel bristle tube brush and then blow it out again. If the borehole is wet,
completely flush it with water while brushing and then blow it clean to remove all water using
oil-free compressed air.
Note:
Use of the Valtir approved vacuum drilling equipment is authorized to replace the blowing
and brushing requirement of Step 3.
4) Apply Approved Adhesive
Fill the borehole 100% full.
Caution:
Fill borehole 100% full so it is even with the pavement surface per
manufacturer’s instructions.
5) Add the Washers and Nuts
Place a flat washer onto the stud then thread a nut on until the end of
the stud is flush with the nut (Figure 9).
6) Insert Studs in Boreholes and Wait for Adhesive to Cure
Push the stud down through the part to be anchored and into the
borehole.
Caution:
Do not disturb or load the stud until the approved
adhesive material has fully cured (reference instructions
supplied with the approved adhesive kit).
7) Torque the Nuts
Once the adhesive has fully cured, torque the nut to the adhesive
manufacturer’s recommended values.
Anchor Assembly Cautions
1) Steel rebar
If steel rebar is encountered while drilling an anchor bolt borehole, apply one of the following
solutions:
A) Use a rebar drill bit for the
rebar
only
and then switch back to the concrete bit to finish
drilling into the underlying concrete until the proper borehole depth is reached.
Caution:
Do not drill through rebar without first obtaining permission to do so
from the project engineer.
B) Drill a new borehole down at an angle past the rebar to the proper depth. Anchor the
stud by completely filling both boreholes with an approved adhesive.
Figure 9
Vertical Application
(Before Applied Torque)
Summary of Contents for QuadGuard M10
Page 1: ......
Page 41: ...Valtir com 40 Revision F August 2022 QuadGuard M10 w Tension Strut Backup QGMTSCVR U...
Page 42: ...Valtir com 41 Revision F August 2022 TS Concrete Pad 618686...
Page 43: ...Valtir com 42 Revision F August 2022 TS Concrete Pad 8 w Rebar 618686...
Page 44: ...Valtir com 43 Revision F August 2022 TS Concrete Pad 8 wo Rebar 618686...
Page 45: ...Valtir com 44 Revision F August 2022 Tension Strut Backup 627448...
Page 46: ...Valtir com 45 Revision F August 2022 Monorail Assembly 625637...
Page 47: ...Valtir com 46 Revision F August 2022 Diaphragm Assembly 625650...
Page 48: ...Valtir com 47 Revision F August 2022 Shim Kit 627518...
Page 49: ...Valtir com 48 Revision F August 2022 Fender Panel Assembly 608236...
Page 50: ...Valtir com 49 Revision F August 2022 Nose Assembly 626814...
Page 51: ...Valtir com 50 Revision F August 2022 31 W Beam Guardrail Transition QGMTSCVR TWLR...
Page 52: ...Valtir com 51 Revision F August 2022 Thrie Beam Guardrail Transition QGMTSCVR TTLR...
Page 53: ...Valtir com 52 Revision F August 2022 Safety Shape Barrier Transition QGMTSCVR T4...
Page 54: ...Valtir com 53 Revision F August 2022 Single Slope Transition QGMTSCVR T6...
Page 55: ...Valtir com 54 Revision F August 2022 Vertical Barrier Transition QGMTSCVR ES...
Page 56: ...Valtir com 55 Revision F August 2022 Vertical Barrier Transition Extended QGMTSCVR SPE...
Page 57: ...Valtir com 56 Revision F August 2022 NOTES...
Page 58: ...Valtir com 57 Revision F August 2022 NOTES...
Page 59: ...Valtir com 58 Revision F August 2022 NOTES...
Page 60: ......