background image

www.valtir.com 

Revision F November 2022

 

Important:

  Read safety instructions thoroughly and follow the assembly 

directions and suggested safe practices before assembling, maintaining, or 

repairing the Energite

®

 III/Fitch

®

 Universal Module Systems. Failure to follow this 

warning can result in serious injury or death to workers  and/or bystanders. It 

further compromises the acceptance of this system by the FHWA. Please keep 

these instructions for later use. 

 

Warning:

 Ensure that all of the Energite

®

 III/Fitch

®

 Universal Module Systems 

Warnings, Cautions, and Important statements within the Energite

®

  III/Fitch

®

 

Universal Module Systems Manual are completely followed. Failure to follow this 

warning could result in serious injury or death. 

 

Recommended Safety Rules for Assembly 

* Important Safety Instructions * 

This Manual must be kept in a location where it is readily available to persons who are skilled 

and experienced in the assembly, maintenance, or repair of  the  Energite

®

  III/Fitch

®

  Universal 

Module Systems. Additional copies of this Manual are available from Valtir by calling (888) 356-

2363  or  online at www.valtir.com.  This Manual may also be downloaded directly from the 

websites indicated below.  Please contact Valtir  if  you have any questions concerning the 

information in this Manual or about the Energite

®

 III/Fitch

®

 Universal Module Systems. 

Always use appropriate safety precautions when operating power equipment, mixing chemicals, 

and when moving heavy equipment or the Energite

®

  III/Fitch

®

  Universal Module Systems 

components. Gloves, safety goggles, steel toe boots, and back protection shall be used. 
Safety measures incorporating traffic control devices specified by the highway authority must be 

used to provide safety for personnel while at the assembly, maintenance, or repair site. 
 

 

 

Summary of Contents for ENERGITE III

Page 1: ......

Page 2: ...This system has been accepted for use by the Federal Highway Administration for use on the national highway system under strict criteria utilized by that agency Valtir representatives are available fo...

Page 3: ...Limitations and Warnings 5 Important Introductory Notes 7 System Overview 8 Recommended Tools 9 Site Preparation Foundation 10 Inspect Shipment 10 Assembly 11 Alternate Assembly Option 15 Checking the...

Page 4: ...used only in conjunction with the assembly of the Energite III Fitch Universal Module Systems and are for standard assemblies only as specified by the applicable highway authority In the event your s...

Page 5: ...ructions This Manual must be kept in a location where it is readily available to persons who are skilled and experienced in the assembly maintenance or repair of the Energite III Fitch Universal Modul...

Page 6: ...l while at the assembly maintenance or repair site Failure to follow this warning could result in serious injury or death Warning Use only Valtir parts that are specified herein for the Energite III F...

Page 7: ...o meet the impact criteria requirements and guidelines of NCHRP Report 350 These tests specifically set forth by FHWA evaluate product performance by simulating those impacts outlined by NCHRP Report...

Page 8: ...ly review this Manual including the Limitations and Warnings section before performing the necessary work Do not attempt to assemble any Energite III Fitch Universal Module Systems without the proper...

Page 9: ...cone insert The cone insert is used to adjust the sand height or center of mass and the overall weight of the barrel The barrel s weight requirement is determined by its place within the array Each mo...

Page 10: ...lts if required Note The above list of tools is a general recommendation Depending on specific site conditions and the complexity of the assembly specified by the appropriate highway authority additio...

Page 11: ...l curbs and raised islands should be removed Where this is not possible a maximum of 100 mm 4 high is recommended The site must also be clear of debris and snow Inspect Shipment Before assembling the...

Page 12: ...l devices Place traffic control devices to protect your crew and motorists 2 Review array specifications Carefully review the array specification provided by a qualified engineer 3 Take measurements T...

Page 13: ...e replaced See Figure 4 Figure 4 7 Moving barrels into position After the location of each module is marked on the pavement place the barrels back into their proper positions Move the barrels into pos...

Page 14: ...Figure 6A Energite III System 9 Placement of inner cones Fitch For a 200 lb module place the Unicore on the top shelf 17 fill to the scribe mark FILL TO HERE FOR 200 resulting in a 7 sand depth and a...

Page 15: ...the first row of modules last row in array is in place they can be filled with the proper level of sand using a sand filled cement truck See Figure 7 Figure 7 The sand must conform to ASTM C 33 washe...

Page 16: ...fter the first row is finished the next row of modules can be positioned filled and the lids snapped on until all the rows are completed Be sure the lids are snapped firmly into place to prevent water...

Page 17: ...an occur at any time Two types of inspections should be performed regularly Visual Drive by Inspection Walk up Inspection Visual Drive By Inspection Checklist Drive by inspections are recommended as n...

Page 18: ...uctions in the Manual Complete the following steps during the walk up inspection 1 Lids in place Be sure all lids are firmly in place 2 Lids not inverted Be sure lids are not inverted inwards 3 Module...

Page 19: ...d 180 kg modules When upgrading or repairing arrays it is recommended to replace cones to meet the current standards 1 Setting up traffic control Set up traffic control to protect your crew as designa...

Page 20: ...Module Systems modules is to use a sand filled cement mixer The sand must conform to ASTM C 33 washed concrete sand or equal The level is indicated on the decal located on the inside of the module Fil...

Page 21: ...www valtir com 20 Revision F November 2022 Maintenance Log Type of Inspection Date System Location Drive By Walk Up Comments...

Page 22: ...www valtir com 21 Revision F November 2022 Notes...

Page 23: ...www valtir com 22 Revision F November 2022 Notes...

Page 24: ......

Reviews: