This section will guide you on measuring the
required length of the Main PVC Supply Line
(Part 8) relative to the final position of the
Template Guide
Steps:
• Measure the distance between the bottom of
the template to the closest approximate hole
position on the top of the template which
corresponds to where the shower outlet pipe
is. Refer to this distance as "d1".
• Add 1 inch to your "d1" measurement.
• Using the length of "d1" as a guide, measure
this length on the Main PVC Supply Line Hose
(Part 8) and shear the excess length from the
hose.
Draw a level horizontal line based on
the lower-edge of the selected hole
Connecting the Supply Line Elbow to the main
PVC Supply Line:
1. Insert the Ring Clamp (Part 7) onto the end
of PVC Supply Line (Part 8).
2. Fully insert the grooved end of the Elbow
Connector (Part 3) into the PVC Supply
Line (Part 8).
3. With a Phillips head screwdriver, tighten the
bolt and nut on the Hose Clamp (Part 7) until
the PVC Supply Line is secured to Elbow
Connector (Part 3).
4. The Elbow Connector (Part 3) will be secured
to the Brass Extender Joint (Part 4) in a later
step.
8
7
6
8
7
3
8
7
3
PH
+
1
2
3
5
INSTALLATION INSTRUCTIONS
- 8 -
8
Summary of Contents for VS-1204 Plus
Page 4: ...4 11 6 9 1 8 1 9 2 9 1 6 11...
Page 5: ...ASSEMBLY b c d 1 9 3 9 3 9 1 6 9 1 9 2 9 3 a 12 11 10 6 9 3 9 3 5...
Page 21: ...21 11 6 9 1 8 1 9 2 9 1 6 11...
Page 22: ...ASSEMBLAGE 22 b c d 1 9 3 9 3 9 1 6 9 1 9 2 9 3 a 12 11 10 6 9 3 9 3...
Page 38: ...38 11 6 9 1 8 1 9 2 9 1 6 11...
Page 39: ...ENSAMBLAJE 39 b c d 1 9 3 9 3 9 1 6 9 1 9 2 9 3 a 12 11 10 6 9 3 9 3...
Page 52: ...www valoreusa com...