Valor Retrofire Series Installation Instructions Manual Download Page 3

3

Inlet Pipe

Manifold Pressure
Test Tap

Supply Pressure
Test Tap

Loosen screw to check
(tighten afterwards)

Pressure Test Tappings

b) 

RF24DV or RF24ID. 

Lever off the small 

domed cap covering the manifold pressure 
setting screw, on the front face of the valve 
cover by using a screwdriver or similar.

6.  Turn on the gas supply and check for leaks

 

using a soap solution. The minimum and maximum 
gas supply pressures are shown in the chart and 
should be verifi ed using the Supply Pressure test 
tap while the unit is running at full input.

7.  Fit a manometer to the manifold pressure test 

tap 

on the valve. Light the appliance and turn the 

control to full input. Check for leaks downstream of 
the valve. 

Front Face of Control Valve

Pry off
Plastic Cap

Adjust the pressure adjustment screw while 
the appliance is running at full input to produce 
manifold pressure as per the chart.

8.  Turn the appliance off.

 Remove the manometer 

and tighten the test tapping screw. Refi t the plastic 
cover to the valve.

9.  Fit the data conversion label 

and signed 

conversion label close to the rating plate. Fit the 
control conversion label near the controls.

10. Reassemble

 the ceramics, install the window, and 

check if the appliance operates correctly (refer to 
the RF24 installation manual).

11.  Adjust the aeration shutter

 (if necessary) as 

described in the RF24 installation manual.

Front Face of Control Valve

Pressure Adjustment Screw
behind Cap

Increases Pressure

Decreases Pressure

RF24BV or 
RF24XB

RF24DV or 
RF24ID

Designed and Manufactured by / for

Miles Industries Ltd.

 190 – 2255 Dollarton Highway, North Vancouver, B.C., CANADA  V7H 3B1

Tel. 604-984-3496  Fax 604-984-0246

www.valorfi replaces.com

Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication.

Reviews: