![Valor MADRONA MF28JN Installation Manual Download Page 9](http://html2.mh-extra.com/html/valor/madrona-mf28jn/madrona-mf28jn_installation-manual_3297561009.webp)
9
Dimensions & Clearances
Modern Stove MFCS05
x
31-7/8 [809]
26-11/16 [678]
27-1/4 [691]
inches [mm]
Gas line
connection
point
Hinged control
access door
x
B
A
26-1/4 [667]
14-3/4 [374]
16-1/4 [413]
1 [2
minimu
Gas line access
point 10 [254]
Mantel
Ø 6-5/8”
venting
Centre of vent
x
2 [52]
minimum
16-15/16 [430]
4-5/8 [118]
1 [26]
minimum
10 [254]
x
Suggested gas line
access point through wall.
Route to avoid optional fan.
Pipe supplied
with engine
(see engine
manual)
e access
0 [254]
Gas line connection point
3/8” NPT FEMALE at valve
Sidewall
Ø 6-5/8”
venting
Minimum 61-1/8” (1553 mm)
Front surface
of stove
M
inimum 18-1/4” (464 mm)
Minimum 43-1/4”
(1091 mm)
Minimum
12-7/8”
(327 mm)
90°
Zero clearance
Alcove Clearances
31-1/4” [794 mm] minimum
26” [660 mm]
maximum
42” [1067 mm] minimum
Corner clearances
Mantel / shelf clearances
Mantel
Depth ‘A’
0–1”
(0–26 mm)
2–5”
(51–127 mm)
6–18”
(152–457 mm)
19–24”
(483–610 mm)
Mantel
Height ‘B’
34”
(864 mm)
36”
(914 mm)
38”
(965 mm)
42”
(1067 mm)