6
3.
UNPACKING & PRE-INSTALLATION PREPARATION
3.1.
Carton Contents
The carton contains the following:-
1.
Fire assembly.
1.
Ceramic fuel effect (In packaging inside
firebox).
1.
Closure plate.
1.
Flue spigot.
1.
Pair of feet (for floor mounting the appliance).*
1.
Pair of feet shrouds (for floor mounting the
appliance).*
1.
Pack of fixings containing:
2.
Plastic caps for foot screws.
4
No 8 tapping screws for flue spigot
4
Woodscrews for wall mounting
4 Wall
plugs
2
Knurled screws for feet shrouds
4
M5 screws for feet
1.
Inlet elbow connector.
1.
Smoke match tube.
Remove all the items carefully to prevent damage. Some
items may be contained in the packaging fitments -
Examine the packaging carefully before discarding.
Check that all the items are present and undamaged.
*The polystyrene top fitment containing the feet and
feet shrouds indicates which items are for the left and
right sides. To ease identification at the assembly stage,
leave the parts in the polystyrene until you are ready to
fit them.
3.2.
Fireplace Flue Pull
After preparing the fireplace, apply a lighted match,
paper or smoke match to the chimney opening. Observe
the smoke. If there is a definite flow into the opening
continue with the installation. If there is not a definite
flow, preheat the chimney for a few minutes and recheck
If there is still no definite flow, the chimney may need
attention.
Do not fit the appliance. Seek expert
advice.
3.3.
Appliance Preparation
3.3.1.
Stand the fire upright.
3.3.2.
Detach the window surround (See figure 4):
a)
Remove the two knurled screws immediately
below the outer case canopy.
b)
Lift the surround clear of the slots in the outer
case apron
3.3.3.
Remove the control knob by pulling clear of the
gas tap spindle.
Fig. 4 Window surround removal