55
WARNING
CHOKING HAZARD!
Ensure that the fi replace
area is clear fi reglass particles as these could be
ingested by small children. Vacuum area after
installation.
Installation
Install Decorative Glass Murano 1103DGM
(1100 models)
Material required
• Decorative Glass Murano kit, which contains:
•
1 glass platform
•
2 platform retainers
•
1 bag of clear 1/2” fi reglass
• Gloves (recommended to manipulate glass)
Installation
Carefully unpack the kit. Wear gloves to handle the
fi reglass.
1. Install the platform retainers as indicated.
2. Install the glass platform on top of the retainers.
3. Carefully spread the glass on top of the burner
within the platform opening.
NOTE:
Ensure the area within the pilot shield is
clear of glass particles.
Pilot area
!
QUALIFIED
INSTALLER