FP15 & FP15A Waterloo - Installation and Operation Manual
47
B
NON-COMBUSTIBLE
FRAMING (STEEL STUD)
CLEARANCE
D
84" (2.13m)
This section must
remain empty
Non-combustible
material such as
cement board
Non-combustible
finishing material
Refer to the building code or the local code for regulations
concerning the need to install finishing material inside the
chase around the fireplace.
NOTE
THIS FIREPLACE IS BUILT TO MAINTAIN A 1/2" GAP
MINIMUM BETWEEN THE FIREPLACE AND THE
FACEPLACE.
IT IS RECOMMANDED TO HAVE THE NON-
COMBUSTIBLE MATERIAL FLUSH WITH THE
FIREPLACE.
Summary of Contents for Waterloo
Page 2: ...2 FP15 FP15A Waterloo Installation and Operation Manual ...
Page 11: ...FP15 FP15A Waterloo Installation and Operation Manual 11 2 3 Measurements FP15 ...
Page 12: ...12 FP15 FP15A Waterloo Installation and Operation Manual ...
Page 13: ...FP15 FP15A Waterloo Installation and Operation Manual 13 2 4 Measurements FP15A ...
Page 14: ...14 FP15 FP15A Waterloo Installation and Operation Manual ...
Page 78: ...78 FP15 FP15A Waterloo Installation and Operation Manual ...
Page 88: ......