FP14 Cartier - Installation and Operation Manual
57
installing
the
first
chimney
length.
Continue
installing
chimney
lengths
making
sure
to
lock
each
length
in
place.
4.
Every
time
the
chimney
passes
through
a
ceiling
or
a
wall,
install
the
appropriate
firestop.
When
you
reach
the
desired
height,
install
the
roof
support
(not
illustrated).
(Refer
to
instructions
included
with
the
support).
5.
Then,
put
the
roof
flashing
(D)
in
place
and
seal
the
joint
between
the
roof
and
the
flashing
with
roofing
pitch.
For
sloping
roofs,
place
the
flashing
under
the
upper
shingles
and
on
top
of
the
lower
shingles.
Nail
the
flashing
to
the
roof,
using
roofing
nails.
6.
Place
the
storm
collar
(E)
over
the
flashing,
and
tighten
it
with
the
bolt
supplied.
Finally,
seal
the
joint
between
the
storm
collar
and
the
chimney,
using
silicone
caulking.
7.
Install
the
chimney
cap
(G).
8.
When
a
ventilated
roof
flashing
is
installed,
precautions
are
to
be
taken
not
to
caulk
or
seal
the
ventilating
openings.