Do not use combustible materials for the frame directly above the fireplace. This area
should remain empty to a height of 76" (1.93 m) measured from the base of the fireplace.
Build the fireplace frame using vertical studs placed on the
sides of the fireplace, from the floor to the ceiling. The studs
must be set back from the front edge of the fireplace by a
space equivalent to the thickness of the finishing material,
so that it is flush with the finish of the fireplace.
Headers between studs should be installed as follows:
− The headers must be 2» x 3» (5 cm x 8 cm) or 2» x 4» (5 cm x
10 cm). Do not put wood or other material in the area above
the fireplace.
− Install only the cripple studs needed to support the finishing
material and mantle.
WARNING : DO NOT FILL THE REQUIRED EMPTY
SPACE INSIDE THE ENCLOSURE WITH INSULATION
OR ANY OTHER MATERIAL.
The fireplace must not be in contact with any insulation or
loose filling material. Inside the chase, around the fireplace,
insulation should be covered with drywall panels or any
other finishing material except where non-combustible
material is required.
41 5/8"
1058mm
76"
1930mm
VARIABLE
CET ESPACE DOIT
RESTER VIDE
THIS SPACE MUST
REMAIN EMPTY
8.5.1 Fireplace Framing
D
B
A
C
Framing dimensions should be used as a reference only
If a finishing material is installed inside the enclosure, its
thickness must be added to the following measurements.
The chase can be constructed of combustibles
materials except for headers in gray.
FP12R
A
Framing width
51 ¼"
(1,3 m)
B
Framing height to the first
header
41
⅝
"
(1,05 m)
C
Framing depth
25"
(635 mm)
D
Framing total height
76"
(1,93 m)
Summary of Contents for FP12R
Page 2: ......
Page 6: ...Page 6 Installation and Operation Manual FP12 Mundo II ENGLISH CERTIFICATION PLATE...
Page 73: ......
Page 74: ...NOTES...
Page 75: ...NOTES...