![Valcourt FG00001 Installation Instructions Manual Download Page 19](http://html2.mh-extra.com/html/valcourt/fg00001/fg00001_installation-instructions-manual_3064204019.webp)
Page 19
Installation Manual - L48
ENGLISH
FRAMING
3.3.2 Installation with ceiling at 84
"
or more
N
O
N
-C
O
M
BU
ST
IB
LE
M
A
TE
RI
A
L
A
RE
A
58
1
/4
"
14
79
m
m
M
IN
.
MANTEL
70
7
/1
6"
17
90
m
m
M
IN
.
84
"
21
34
m
m
M
IN
.
12"
305mm
A B
C
D
E
F
G
H
COMBUSTIBLE TRIM
AND MANTEL
ALLOWED IN
SHADED AREA
24
"
60
9m
m
32
3
/4
"
83
2m
m
NON
COMBUSTIBLE
PANNEL
FRAMING HEADER
NON-COMBUSTIBLE
NOTE: COMBUSTIBLE MATERIALS ALLOWED IN SHADED AREA
8"
202mm
MIN.
8"
202mm
MIN.
13"
330mm
MIN.
2"
51mm
MIN.
3"
75mm
MIN.
Index
letter
Distance from
fireplace opening
Distance
from finished
wall
A
34"
12"
B
34"
10"
C
32"
8-3/8"
D
30"
6-5/8"
E
28"
5"
F
26"
3-3/8"
G
24"
1-3/4"
H
22"
0"
This fireplace can be elevated off the floor provided that the fireplace is properly supported by
framing materials and the ceiling clearances are maintained.
Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned
to accommodate wall covering and fireplace facing material.
The fireplace framing should be
constructed of metal studs
.
CAUTION
Measure fireplace dimensions and verify framing methods, and wall covering details
before framing construction begins.
WARNING
If the fireplace is installed directly on carpeting, tile or other combustible material
other than wood flooring, it should be installed on a metal or wood panel extending
the full width and depth of the fireplace.