background image

5 Installation

10

Installation and maintenance instructions uniSTOR HP 0020221300_04

Size of
the outlet
valve

Minimum
diameter
of the
discharge
pipe D1

Minimum
diameter
of the dis-
charge
pipe from
the tun-
dish D2

Maximum
permiss-
ible res-
istance,
inform-
ation
on the
length of
a straight
pipe

Resist-
ance per
elbow or
bend

1/2"

15 mm

22 mm
28 mm
35 mm

9 mm

18 m

27 m

0.8 m
1.0 m
1.4 m

3/4"

22 mm

28 mm
35 mm
42 mm

9 m

18 m

27 m

1.0 m
1.4 m
1.7 m

1"

28 mm

35 mm
42 mm
54 mm

9 m

18 m

27 m

1.4 m
1.7 m
2.3 m

Sample calculation

The following example corresponds to a temperature and
pressure relief valve G1/2 with a drain pipe

(D2)

with four 22

mm elbows and a length of 7 m from the tundish to the drain-
age point. According to the table, the maximum permiss-
ible resistance for a straight length of a 22-mm-thick cop-
per discharge pipe

(D2)

of a thermal expansion relief valve

G1/2 is 9.0 m. The resistance of the four 22 mm elbows,
which are each 0.8 m in length, must be subtracted from this,
i.e. a total of 3.2 m. The maximum permitted length is ac-
cordingly 5.8 m and is therefore below the current length of
7 m. The calculation must therefore be performed using the
second largest size. The maximum permissible resistance
for a straight length of a 28-mm-thick pipe

(D2)

of a thermal

expansion relief valve G1/2 is 18 m. The resistance of the
four 28 mm elbows, which are each 1.0 m in length, must be
subtracted from this, i.e. a total of 4.0 m. The maximum per-
mitted length is accordingly 14 m. As the current length is
7 m, a 28 mm copper pipe

(D2)

should be selected.

A suitable location for the discharge pipe terminal is, for
example, beneath a fixed mesh above the odour trap in a
soakaway with a siphon. Low drain pipework, for example
up to 100 mm above external surfaces (car parks, mead-
ows, etc.) can be used provided that it is protected by a wire
fence or something similar to prevent children from coming
into contact with the waste water and provided that the sys-
tem is not visible. Do not install any valves or stopcocks on
the drain pipework.

Make sure that the discharge pipe from the tundish to the
drain has a constant downward gradient of at least 1:200.
The discharge pipe for the heat generator expansion relief
valve can be connected to the horizontal discharge pipe for
the cylinder behind the tundish using a T-piece.

5.2.5.1 High-level drain

Installing the highest drain is permitted as long as this does
not present a danger to anyone in or outside the building at
the drain point. Examples of points to consider when decid-
ing whether a location is suitable for the highest drain:

The possibility (taking the wind into account) that a per-
son might stay in the area where the water is drained
for a prolonged period of time, and, if this is the case,
whether the water is sufficiently cooled by that point to
pose no danger. The thermal conductivity of the material
surfaces, the climatic conditions, the installation location
and the drain pipework direction can, to different extents,
contribute to reducing the temperature of the water that is
being drained.

The position of the windows and other openings.

The probability of prams being under the drain opening.

The resistance of the surface to hot water.

The possibility of ice forming if water drains onto access
paths.

5.2.6

Installing the temperature sensor for the
immersion heater

Note

The temperature sensor is used to control the
immersion heater via a multi-functional module
or a control.

Condition

: With a multi-functional module or control

Secure the temperature sensor.

Summary of Contents for uniSTOR VIH RW GB BES Series

Page 1: ...ation and maintenance instructions uniSTOR HP VIH RW GB BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de www vaill...

Page 2: ...ct dimensions 7 5 Installation 7 5 1 Installing the product 7 5 2 Hydraulic connection 8 5 3 Electrical installation 11 6 Start up 13 6 1 Setting the immersion heater thermostat 13 6 2 Cold water inle...

Page 3: ...ntenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and mai...

Page 4: ...correct tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is...

Page 5: ...ements of the appropriate Building Regu lations The Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Ins...

Page 6: ...ation area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise heat...

Page 7: ...mplete Refer ence point Quant ity Designation 1 1 Enclosed documentation 2 1 Tundish with retainer 3 1 3 port motorised valve 4 1 Safety group 5 1 Expansion vessel 6 1 Bag with accessories 7 1 Domesti...

Page 8: ...nd pres sure expansion relief valve 7 Domestic hot water outlet 8 Safety group 9 Tundish 10 Expansion vessel 11 Dry pocket for the tem perature sensor 12 Cold water inlet 13 Drain valve 5 2 1 Connecti...

Page 9: ...e 15 mm Length of the pipe between the temperature and pressure relief valve and the expansion relief valve 4 600 mm 6 Connect the cold water supply to the safety group 6 Diameter of the cold water su...

Page 10: ...p in a soakaway with a siphon Low drain pipework for example up to 100 mm above external surfaces car parks mead ows etc can be used provided that it is protected by a wire fence or something similar...

Page 11: ...ling through the product The product may be damaged by drilling work Do not drill through the product 70 60 50 40 70 60 50 40 1 3 2 4 1 3 2 4 1 2 3 4 1 Immersion heater 2 Immersion heater ther mostat...

Page 12: ...he cover for the electrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance with the applicable standards 3 Use heat resistant cables for the immersion heater c...

Page 13: ...the primary circuit 1 Connect the thermostat for the primary circuit and the thermal cut out Diameter of the cable 1 5 mm Condition S plan 70 60 50 40 70 60 50 40 1 3 2 4 1 3 2 4 L N 2 1 3 2 2 4 4 1 8...

Page 14: ...r ator 3 Move the lever to AUTO 4 Remove the cover for the electrics 5 Set the product s thermostat and the immersion heater s thermostat Setting the thermostats 60 6 Start up the heat generator 7 Dra...

Page 15: ...pressure of the expansion vessel 1 Drain the product Page 15 2 Measure the pre charge pressure of the expansion ves sel at the vessel valve Condition Pressure 0 3 MPa 0 3 bar Top up the expansion ves...

Page 16: ...stat to 55 C 4 Replace the thermostat Irregular domestic hot water output at the valve 1 Defective expansion vessel 2 Thermal control 1 Set the expansion vessel 2 Interrupt the power supply of the pro...

Page 17: ...90 90 90 Load pressure in the expan sion vessel 0 3 MPa 3 0 bar 0 3 MPa 3 0 bar 0 3 MPa 3 0 bar 0 3 MPa 3 0 bar Maximum temperature of the heating circuit 95 95 95 95 Maximum domestic hot water tempe...

Page 18: ...230 V 50 Hz Immersion heater power 2 8 kW 2 8 kW 2 8 kW 2 8 kW Low loss header 230 240 V 50Hz 230 240 V 50Hz 230 240 V 50Hz 230 240 V 50Hz Thermostat 230 240 V 50Hz 230 240 V 50Hz 230 240 V 50Hz 230...

Page 19: ...Appendix 0020221300_04 uniSTOR HP Installation and maintenance instructions 19 D Commissioning Checklist...

Page 20: ...WUROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is...

Page 21: ...3 Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Com...

Page 22: ...ipe 9 Documents 5 Drain valve 8 Draining the product 15 E Electricity 3 F Filling and purging the primary circuit 14 Filling and purging the product 14 Frost 4 H Handing over to the end user 14 I Iden...

Page 23: ......

Page 24: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Reviews: