background image

Appendix

0020196671_06 eloSTOR pro Installation and maintenance instructions

15

Operating mode

Mains connection

Basic load

Rapid heating

Manual mode

1 2

L1

L3

L2

N

4 5

L2

N

PE

L1

VEH 50/7-3

VEH 80/7-3

VEH 100/7-3

4 kW

VEH 120/7-3

4.5 kW

1 2

L1

L3

L2

N

4 5

N

PE

L3

L2

L1

VEH 50/7-3

VEH 80/7-3

VEH 100/7-3

6 kW

VEH 120/7-3

6 kW

D

Maintenance plan

Maintenance work

Interval

Checking seals

Each time maintenance work is
carried out

Tighten the fixing screws

Each time maintenance work is
carried out

Checking the magnesium protection anode

Every three years

Checking the inner vessel and components for scale deposition

Every three years

E

Technical data

Technical data

General

VEH 7-3

Operating mode

Single- or twin-circuit switching or manual operation

Thermal insulation

PU foam, CFC-free

Inner vessel

Steel, enamelled, with magnesium protection anode

Safety

Complies with national safety regulations; radio-shielded; does not affect the mains
supply

Technical data

General

VEH 50/7-3

VEH 80/7-3

VEH 100/7-3

VEH 120/7-3

Product dimensions, height

637 mm

875 mm

1.041 mm

1.207 mm

Product dimensions, width

504 mm

504 mm

504 mm

504 mm

Product dimensions, depth

450 mm

450 mm

450 mm

450 mm

Weight when filled with water

80 kg

130 kg

160 kg

185 kg

Nominal capacity

50 l

80 l

100 l

120 l

Electrical power consumption

1 kW

2 kW

4 kW

6 kW

1 kW

2 kW

4 kW

6 kW

1 kW

2 kW

4 kW

6 kW

1.5 kW

3 kW

4.5 kW

6 kW

Technical data

Output

VEH 50/7-3

VEH 80/7-3

VEH 100/7-3

VEH 120/7-3

Standby energy consumption (in 24 hours at
65 °C)

0.6 kWh

0.8 kWh

0.93 kWh

1.06 kWh

Selectable hot water temperature range

7 … 85 °C

7 … 85 °C

7 … 85 °C

7 … 85 °C

Energy-saving setting

60 °C

60 °C

60 °C

60 °C

Mixed water volume from 40 °C

96 l

157 l

196 l

237 l

Summary of Contents for eloSTOR pro VEH 50/7-3

Page 1: ...nce instructions eloSTOR pro VEH 50 7 3 VEH 80 7 3 VEH 100 7 3 VEH 120 7 3 AT DE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 49 21 91 18 0 Fax 49 21 91 18 2810 info va...

Page 2: ...Installing the product 6 5 Installation 7 5 1 Hydraulic installation 7 5 2 Requirements for electrical installation at the installation site 7 5 3 Electrical installation 8 6 Start up 8 6 1 Operating...

Page 3: ...s not classed as intended use Units that are not classed as vehicles are those that are installed in a fixed and permanent location known as fixed installation Any other use that is not specified in t...

Page 4: ...er injuries Install the necessary safety group compon ents Do not install hydraulic accessories between the safety group and the do mestic hot water cylinder s cold water pipe Explain to the operator...

Page 5: ...data MPa bar Max operating pressure IP25D IP rating VDE mark 3 2 CE label The CE label shows that the products comply with the basic requirements of the applicable directives as stated on the identif...

Page 6: ...ation or replace ment for VEH 6 3 Bearing surfaces for wall support 4 Hot water connection 5 Discharge connection 6 Cold water connection A1 Distance between the product bracket and water connections...

Page 7: ...et Install the drain pipework at a constant incline Maintain a clearance between the expansion relief valve s discharge pipe and the tundish so that the drain pipework is open to the atmosphere Cleara...

Page 8: ...train relief 4 3 Tighten the screws on the strain relief 4 4 Secure the mains connection cable 1 to the mains connection terminal 5 5 Guide the auxiliary connection cable 2 through the cable duct 3 an...

Page 9: ...ect the product from the power supply Page 10 2 Empty the product Page 10 Removing the flange 3 Unscrew the cover on the flange 4 Remove the electrical connections on the heating ele ments 2 from the...

Page 10: ...Remove the mains connection lines Emptying the product 2 Close the cold water stop cock 3 Open a hot water valve connected to the product 4 Drain the domestic hot water cylinder using the drain cock...

Page 11: ...l the domestic hot water cylinder Heat up time too long Check that the electrical plug connections and other connections are seated correctly and correct these if necessary Expansion relief valve is o...

Page 12: ...K2 HK3 TR STB 1 2 3 4 10 6 11 12 13 5 7 8 9 1 Feeding in the single twin circuit switching 2 Mains connection terminal 3 Relay 4 Signal lamp 5 Thermostat 6 Safety overheat cut off device 7 Vessel eart...

Page 13: ...1 VEH 50 7 3 VEH 80 7 3 VEH 100 7 3 4 kW VEH 120 7 3 4 5 kW 1 2 L1 L3 L2 N 4 5 N PE L3 L2 L1 VEH 50 7 3 VEH 80 7 3 VEH 100 7 3 6 kW VEH 120 7 3 6 kW Operating mode Mains connection Basic load Rapid he...

Page 14: ...0 7 3 VEH 80 7 3 VEH 100 7 3 2 kW VEH 50 7 3 VEH 80 7 3 VEH 100 7 3 4 kW VEH 120 7 3 3 kW VEH 120 7 3 4 5 kW 1 2 L1 L3 L2 N 4 5 L1 N PE L2 L3 VEH 50 7 3 VEH 80 7 3 VEH 100 7 3 1 kW VEH 50 7 3 VEH 80 7...

Page 15: ...n Thermal insulation PU foam CFC free Inner vessel Steel enamelled with magnesium protection anode Safety Complies with national safety regulations radio shielded does not affect the mains supply Tech...

Page 16: ...t 3 kW 2 16 h Heat up time from 10 to 60 C at 4 kW 0 73 h 1 00 h 1 82 h Heat up time from 10 to 60 C at 4 5 kW 1 32 h Heat up time from 10 to 60 C at 6 kW 0 39 h 0 68 h 0 90 h 0 98 h Permissible opera...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...betreiber info vaillant at termin vaillant at www vaillant at www vaillant at werkskundendienst Vaillant Deutschland GmbH Co KG Berghauser Str 40 D 42859 Remscheid Telefon 021 91 18 0 Telefax 021 91 1...

Reviews: