11 Decommissioning
36
Installation and maintenance instructions ecoTEC plus 0020134823_07
4.
Release the sealing collars on the flow and return pipe
from the floor plate.
1
5.
Remove the screws
(1)
from the heat exchanger
bracket.
6.
Lift the heat exchanger out of its bracket (this requires
two people). The pipes can be used as handles for this.
7.
Install the new heat exchanger in reverse order.
8.
Install the gas-air mixture unit. (
→
Page 32)
9.
Fill and purge the product and, if necessary, the heating
installation.
10.10.6 Replacing the PCB and/or the display
Caution.
Risk of material damage caused by incor-
rect repairs.
Using an incorrect replacement display may
cause damage to the electronics.
▶
Before replacing, check that the correct
replacement display is available.
▶
Never use another replacement display.
Note
If you are replacing only one component, the set
parameters are transferred automatically. When
the product is switched on, the new component
adopts the previously set parameters from the
unreplaced component.
1.
Disconnect the unit from the power grid and secure it
against being switched back on again.
Condition
: Replacing the display
or
PCB
▶
Replace the PCB or display according to the assembly
and installation instructions supplied.
Condition
: Replacing the PCB
and
display at the same time
▶
Select the required language.
◁
If you are replacing both components at the same
time, the product switches directly to the menu to
select the language after switching on. The factory-
set language setting is English.
▶
Confirm your setting by pressing (
OK
).
◁
You are automatically taken to
D.093
to set the
device specific number.
▶
Select the correct value for the relevant product type in
accordance with the following table.
Device Specific Numbers (DSN - Device Spe-
cific Number) for the product types
Product type number
806 (VU GB 806/5
‑
5)
82
1006 (VU GB 1006/5
‑
5)
81
1206 (VU GB 1206/5
‑
5)
80
▶
Confirm your setting.
◁
The electronics are now set to the product type and
the parameters of all diagnostics codes are set to
factory settings.
◁
The display automatically restarts with the installation
assistant.
▶
Make the system-specific settings.
10.11 Completing repair work
▶
Check the product for tightness (
→
Page 24).
11 Decommissioning
11.1
Decommissioning the product
▶
Switch off the product.
▶
Disconnect the product from the power grid.
▶
Close the gas stopcock.
▶
Close the cold-water isolation valve.
▶
Drain the product. (
→
Page 33)
12 Recycling and disposal
Disposing of the packaging
▶
Dispose of the packaging correctly.
▶
Observe all relevant regulations.
13 Customer service
To ensure efficient and reliable operation of your boiler it is
recommended that regular servicing is carried out by your
service provider.
Summary of Contents for ecoTEC plus 1006 VU GB 1006/5-5
Page 59: ......