Appendix
46
Installation and maintenance instructions ecoTEC plus 0020134823_07
G
Initial start-up checklist
Location
Competent person
Customer service tech-
nician
Name
Street/house number
Postcode
Town/city
Telephone
Start-up date
Serial number
Basic hydraulic diagram
G.1
Initial start-up checklist
Yes
No
Values
Unit
Installation, general
Building type (house/apartment building, special building)
Used for commercial purposes?
Year of manufacture
Insulation status/renovation
System output
kW
Previous gas/energy consumption
m
³
or kWh/a
Heated surface
m
²
Number of heating circuits
–
Underfloor heating circuits
–
Radiator heating circuits
–
Ventilator heating circuits
Water hardness when starting up
mol/m
³
or mg/l
CaCO
₃
Type of cleaning carried out?
First flushing (cold) of the heating circuit carried out?
First flushing (cold) of the boiler carried out?
Which chemicals used for cleaning?
Which treatment of hot flush filling water?
Second flushing (hot) of the boiler carried out?
Maintenance schedule for checking levels of inhibitor?
System volume
l
Added additive: Designation, amount
Gas supply
Gas type
Net calorific value
kWh/m
³
Gas pressure regulator available?
If yes, which type?
Condensate discharge
Condensate trap filled?
Condensate discharge pipe routed with a downward
gradient?
Neutralisation device available (> 200 kW)?
If yes, which manufacturer?
Condensate pump available (if required)?
Condensate pump control line connected?
Hydraulics
Summary of Contents for ecoTEC plus 1006 VU GB 1006/5-5
Page 59: ......