4 Set-up
16
Installation and maintenance instructions auroTHERM exclusive 0020077989_04
4.3.2
Putting together components
▶
Use the following tables to put together the components
for installation.
Number of VTK
1140/2 collectors
1
2
3
4
5
6
7
Components
Number of required sets
VTK installation set (basic
set)
1
1)
VTK installation set (exten-
sion set)
−
1
2
3
4
5
6
Installation set for open-
air/flat-roof installation
2
3
4
5
6
7
8
Required rack
2
3
4
5
6
7
8
Rail set (2 pcs), VTK
1140/2
1
2
3
4
5
6
7
1)
1 set each per collector field for connecting to the
pipelines; the collectors are connected together using the
extension set
Number of VTK
1140/2 collectors
1
2
3
4
5
6
Number of VTK
570/2 collectors
1
1
1
1
1
1
Components
Number of required sets
VTK installation set (basic set)
1
1)
VTK installation set (extension
set)
1
2
3
4
5
6
Installation set for open-air/flat-
roof installation
3
4
5
6
7
8
Required rack
3
4
5
6
7
8
Rail set (2 pcs), VTK 1140/2
1
2
3
4
5
6
Rail set (2 pcs), VTK 570/2
1
1)
1 set each per collector field for connecting to the
pipelines; the collectors are connected together using the
extension set