1 Safety
6
Installation manual auroTHERM, auroTHERM plus 0020100571_03
Work should be preceded by a risk assess-
ment covering all aspects of health and
safety risks, or training requirements that can
reasonably be foreseen to be associated with
the work. All scaffolding in the UK, other than
prefabricated (zip-up) scaffold towers, must
be designed and constructed by a vetted con-
tractor, and have suitable kick boards, hand
rails and where appropriate netting. Areas
around the scaffolding should be zoned off
and marked with suitable warning signs to
a suitable distance to protect persons from
falling objects. Workers should have available
and use personal protective equipment as
necessary. This would include equipment
such as fall protection systems, safety gloves,
goggles, dust masks as well as any special-
ised equipment that may be in use such as
lifting and handling equipment.
The completed works shall comply with all
necessary BS EN Standards and Codes of
practice as well as Building control or plan-
ning requirements and be confirmed where
necessary by notification to building control or
the appropriate competence based notifica-
tion body.
1.5
CE label
The CE label shows that the products comply
with the basic requirements of the applicable
directives as stated on the identification plate.
The declaration of conformity can be viewed
at the manufacturer's site.