4 On-roof fitting and installation
10
Installation manual auroTHERM classic 0020159946_01
e
lang
e
kurz
h
b
l
b Building width
h Building height
l
Building length
▶
Calculate the building width w, building height h and
building length l.
▶
The values for the edge clearances to be observed, e
short
and e
long
can be found in the following tables.
b
[m]
h [m]
5
6
7
8
9
10
11
12
13
14
15
8
1.0
9
1.0
10
1.0
11
1.0
1.1
12
1.0
1.2
13
1.0
1.2
1.3
14
1.0
1.2
1.4
15
1.0
1.2
1.4
1.5
16
1.0
1.2
1.4
1.6
17
1.0
1.2
1.4
1.6
1.7
18
1.0
1.2
1.4
1.6
1.8
l
[m]
h [m]
5
6
7
8
9
10
11
12
13
14
15
10
1.0
11
1.0
1.1
12
1.0
1.2
13
1.0
1.2
1.3
14
1.0
1.2
1.4
15
1.0
1.2
1.4
1.5
16
1.0
1.2
1.4
1.6
17
1.0
1.2
1.4
1.6
1.7
18
1.0
1.2
1.4
1.6
1.8
19
1.0
1.2
1.4
1.6
1.8
1.9
20
1.0
1.2
1.4
1.6
1.8
2.0
▶
When installing the roof brackets, observe the calculated
edge clearances.
4.1.7
Defining the roof bracket clearances
The text that follows describes the clearances of the roof
brackets for the vertical collector position in the case of "ad-
jacent" array configuration.
4.1.7.1
n
Adjacent array configuration
Conditions
: Collector position: Vertical
20
4
5 *
/
2020
*
*
200 - 300
200 - 300
200 - 300
200 - 300
660 - 860
▶
Define the clearances of the roof brackets.
–
Pre-installation dimension (*): = Finished installation
dimension (**) + 20-25 mm
4.2
Carrying out the installation
The installation steps and notes in these instructions apply
for the vertical collector position in the case of "adjacent"
array configuration.
4.2.1
Installing roof brackets
4.2.1.1 Installing type P (for pantile)
1
3
2
1 Lower roof bracket
2 Top roof bracket
3 Middle roof bracket
1.
Use the top, middle and lower type P roof brackets
shown.