Flue installation instructions ecoTEC 834449_13
2.10
Installing the ridge tile terminal
h
Note
Observe the maximum flue gas pipe lengths as
detailed in sections 2.2.3 and 2.2.4.
2.10.1 Contents included with delivery
40
760
Fig. 2.51 Ridge tile terminal
Ridge tile terminal
Accessory No.: 303 982 (black)
Contents of the accessory:
- Ridge tile terminal
- 40 mm air duct clamp
h
Note
See section 2.2 for details of air/flue gas pipe
elements.
When connecting the ridge tile terminal to the boiler, el-
bows and extensions can be added to the air/flue gas
pipe to produce longer flue gas pipes.
2.10.2 Preparation
Determine the installation site for the boiler with refer-
ence to the installation and maintenance instructions
supplied with the boiler.
• Ensure that all the clearances required for installation
and maintenance are available and that the boiler flue
gas pipe can be installed as detailed in these instruc-
tions.
• Determine the point where the ridge tile terminal is to
pass through the ridge.
h
Note
If an 87° elbow is connected directly to the
boiler, use the 40 mm air duct clamp supplied
with the vertical air flue duct at this position.
2.10.3 Installing the ridge tile
130
130
min.25
R 133
min.20
max.125°
130
130
Fig. 2.52 Ridge tile dimensions
The ridge tile must be purchased from a roof tile manu-
facturer:
Recommended manufacturer:
Aspect East Anglia Limited
The Old Mill, East Harling
NORWICH, Norfolk
NR16 2QW
Website: www.aspectroofing.co.uk
Contact: Chris Haythorpe
General Manager - Tile Division
Tel: 01953 717777
Fax: 01953 717164
1
Fig. 2.53 Assembly of the ridge tile
• Fit the ridge tile (1) in accordance with the tile manu-
facturer's guidelines.
Standard Concentric Systems Ø 60/100 2