7 Handing the product over to the end user

16

Installation and maintenance instructions uniSTOR 0020235301_03

4.

Remove the cover for the electrics.

5.

Set the product's thermostat and the immersion heater's
thermostat.

Setting the thermostats: 60

6.

Start up the heat generator.

7.

Drain the heating circuit as soon as the operating
temperature has been reached in order to remove any
residue from the heating installation.

8.

Fill and purge the heating circuit. Consult the installation
instructions for the heat generator.

6.6

Filling and purging the solar circuit

Consult the solar installation instructions.

7

Handing the product over to the end
user

Once the installation is complete, show the user the loca-
tion and function of the safety devices.

Inform the end user how to handle the product.

In particular, draw attention to the safety warnings which
the end user must follow.

Inform the end user of the necessity to have the product
maintained according to the specified intervals.

8

Troubleshooting

8.1

Detecting and eliminating faults

If problems occur whilst operating the product, check
certain points with the aid of the table in the appendix.
Detecting and eliminating faults (

Page 18)

8.2

Procuring spare parts

The original components of the product were also certified
by the manufacturer as part of the declaration of conformity.
If you use other, non-certified or unauthorised parts during
maintenance or repair work, this may void the conformity of
the product and it will therefore no longer comply with the
applicable standards.

We strongly recommend that you use original spare parts
from the manufacturer as this guarantees fault-free and safe
operation of the product. To receive information about the
available original spare parts, contact the contact address
provided on the back page of these instructions.

If you require spare parts for maintenance or repair
work, use only the spare parts that are permitted for the
product.

9

Inspection and maintenance

9.1

Observing inspection and maintenance
intervals

Adhere to the minimum inspection and maintenance inter-
vals. The inspection may require maintenance to be carried
out earlier, depending on the results.

Inspection and maintenance work

Overview (

Page 18)

The immersion heater can be removed in order to inspect
the inside of the cylinder.

9.2

Draining the product

1.

Close the cold water draw-off valve.

2.

Secure a hose to the drain valve.

3.

Position the hose at a suitable drain.

4.

Open the highest hot water tap in the installation.

5.

Open the drain valve and drain the product completely.

6.

Close the hot water tap and the drain valve.

7.

Remove the hose.

9.3

Checking the safety group's expansion
relief valve and the cylinder's expansion
relief valve

1.

Open all expansion relief valves by turning the plug.

2.

Check whether the water is flowing into the tundish.

3.

Check that the expansion relief valves are in the correct
position and then check the pressure.

4.

Check and, if required, clean the pressure reducer.

9.4

Checking the pre-charge pressure of the
expansion vessel

1.

Drain the product. (

Page 16)

2.

Measure the pre-charge pressure of the expansion ves-
sel at the vessel valve.

Condition

: Pressure <0.3 MPa (0.3 bar)

Top up the expansion vessel in accordance with the
static height of the heating installation, ideally with ni-
trogen, otherwise with air.

3.

If water escapes from the valve of the expansion ves-
sel, you must replace the expansion vessel.

4.

Fill and purge the product. (

Page 15)

10 Decommissioning the product

Switch off the heat generator.

Unplug the domestic hot water cylinder's mains plug.

Close the cold-water stopcock.

Drain the product. (

Page 16)

Remove the hydraulic connections and the temperature
sensor.

Remove the cables for the temperature sensor from the
heat generator, control or multi-functional module.

Summary of Contents for 0010019234

Page 1: ...ation and maintenance instructions uniSTOR VIH S GB 500 BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de www vaill...

Page 2: ...stallation 8 5 1 Installing the product 8 5 2 Hydraulic connection 8 5 3 Electrical installation 12 6 Start up 15 6 1 Setting the immersion heater thermostat 15 6 2 Cold water inlet pressure 15 6 3 Se...

Page 3: ...tenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and main...

Page 4: ...rrect tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is tr...

Page 5: ...e Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Installers are required to carry out installation com...

Page 6: ...llation area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise hea...

Page 7: ...5 Check that the scope of delivery is complete Le gend point Quant ity Description 1 1 Expansion vessel 2 1 Tundish with retainer 3 1 Safety group 4 1 Documentation records 5 1 Domestic hot water cyli...

Page 8: ...dis cretion of the installer install a WRAS ap proved automatic air vent on the hot water outlet at the highest point 1 2 3 4 5 7 6 8 9 10 11 15 13 12 16 17 14 18 20 22 19 21 1 Cylinder draining poin...

Page 9: ...head so that it is facing upwards 5 2 3 Installing the drain valve The drain valve must be supplied by the customer Install the drain valve at the height of the cold water supply or further below this...

Page 10: ...pipe D1 Minimum diameter of the dis charge pipe from the tun dish D2 Maximum permiss ible res istance inform ation on the length of a straight pipe Resist ance per elbow or bend 1 2 15 mm 22 mm 28 mm...

Page 11: ...ability of prams being under the drain opening The resistance of the surface to hot water The possibility of ice forming if water drains onto access paths 5 2 7 Installing the cylinder s temperature s...

Page 12: ...the product 70 60 50 40 70 60 50 40 1 3 2 4 1 3 2 4 70 60 50 40 1 3 2 4 1 2 3 4 3 5 1 Immersion heater 2 Immersion heater ther mostat 3 Retainer for the temper ature sensor 4 Primary circuit thermo st...

Page 13: ...ectrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance with the applicable standards 3 Use heat resistant cables for the immersion heater con nection Cable di...

Page 14: ...multi functional module 5 3 7 Connecting the control Condition eBUS The thermal cut out for the primary circuit is not used when connecting an eBUS unit Condition 230 V control If you use a 230 V cont...

Page 15: ...et the maximum value 6 4 Filling and purging the product Note It is not permitted to use valves or expansion relief valves for the purging 1 Check whether the drain valve is closed 2 Open the domestic...

Page 16: ...k page of these instructions If you require spare parts for maintenance or repair work use only the spare parts that are permitted for the product 9 Inspection and maintenance 9 1 Observing inspection...

Page 17: ...ion and maintenance instructions 17 11 Customer service To ensure regular servicing it is strongly recommended that arrangements are made for a Maintenance Agreement Please contact Vaillant Service So...

Page 18: ...ng 3 Thermostat set too high 4 Defective thermostat 1 Install a mixer tap 2 Repair the cable 3 Reduce the temperature of the thermostat to 55 C 4 Replace the thermostat Irregular domestic hot water ou...

Page 19: ...eating output solar circuit 19 2 kW Flow rate 900 l h Pressure loss in the heat exchanger heating circuit 10 mbar Volume of the heat exchanger heating circuit 23 l Volume of the heat exchanger solar c...

Page 20: ...SW GB 500 BES 3 way motorised valve 230 240 V 50Hz Thermostat 230 240 V 50Hz IP rating 21 Technical data Material VIH SW GB 500 BES Cylinder material Stainless steel 1 4521 Insulation material Glass...

Page 21: ...Appendix 0020235301_03 uniSTOR Installation and maintenance instructions 21 D Commissioning Checklist...

Page 22: ...UROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is t...

Page 23: ...Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comme...

Page 24: ...product 16 E Electricity 3 F Filling and purging the heating circuit 15 Filling and purging the product 15 Filling and purging the solar circuit 16 Frost 4 H Handing over to the end user 16 I Identifi...

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Reviews: