background image

Installation 5

0020235301_03 uniSTOR Installation and maintenance instructions

11

5.2.6.1 High-level drain

Installing the highest drain is permitted as long as this does
not present a danger to anyone in or outside the building at
the drain point. Examples of points to consider when decid-
ing whether a location is suitable for the highest drain:

The possibility (taking the wind into account) that a per-
son might stay in the area where the water is drained
for a prolonged period of time, and, if this is the case,
whether the water is sufficiently cooled by that point to
pose no danger. The thermal conductivity of the material
surfaces, the climatic conditions, the installation location
and the drain pipework direction can, to different extents,
contribute to reducing the temperature of the water that is
being drained.

The position of the windows and other openings.

The probability of prams being under the drain opening.

The resistance of the surface to hot water.

The possibility of ice forming if water drains onto access
paths.

5.2.7

Installing the cylinder's temperature sensor
for the immersion heater

Note

The temperature sensor is used to control the
immersion heater via a multi-functional module
or a controller.

Condition

: With multi-functional module or controller

Secure the temperature sensor.

5.2.8

Installing a secondary return

1

2

3

4

5

1

Cylinder

2

Non-return valve

3

Circulation pump

4

Secondary return pipe

5

Hot water outlet

1.

Carry out the installation in accordance with the schem-
atic drawing.

2.

Install an additional expansion vessel on the heating
return.

3.

If the secondary return is not installed, fit a plug on the
cylinder.

Diameter of the plug: 22 mm

5.2.9

Installing the thermostatic mixer

Condition

: Installation without secondary return

Install the cylinder thermostatic mixer on the hot water
flow.

Condition

: Installation with secondary return

J

1

2

3

4

8

5

10

6

9

7

1

Expansion vessel
(Available as an ac-
cessory)

2

Tundish

Summary of Contents for 0010019234

Page 1: ...ation and maintenance instructions uniSTOR VIH S GB 500 BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de www vaill...

Page 2: ...stallation 8 5 1 Installing the product 8 5 2 Hydraulic connection 8 5 3 Electrical installation 12 6 Start up 15 6 1 Setting the immersion heater thermostat 15 6 2 Cold water inlet pressure 15 6 3 Se...

Page 3: ...tenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and main...

Page 4: ...rrect tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is tr...

Page 5: ...e Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Installers are required to carry out installation com...

Page 6: ...llation area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise hea...

Page 7: ...5 Check that the scope of delivery is complete Le gend point Quant ity Description 1 1 Expansion vessel 2 1 Tundish with retainer 3 1 Safety group 4 1 Documentation records 5 1 Domestic hot water cyli...

Page 8: ...dis cretion of the installer install a WRAS ap proved automatic air vent on the hot water outlet at the highest point 1 2 3 4 5 7 6 8 9 10 11 15 13 12 16 17 14 18 20 22 19 21 1 Cylinder draining poin...

Page 9: ...head so that it is facing upwards 5 2 3 Installing the drain valve The drain valve must be supplied by the customer Install the drain valve at the height of the cold water supply or further below this...

Page 10: ...pipe D1 Minimum diameter of the dis charge pipe from the tun dish D2 Maximum permiss ible res istance inform ation on the length of a straight pipe Resist ance per elbow or bend 1 2 15 mm 22 mm 28 mm...

Page 11: ...ability of prams being under the drain opening The resistance of the surface to hot water The possibility of ice forming if water drains onto access paths 5 2 7 Installing the cylinder s temperature s...

Page 12: ...the product 70 60 50 40 70 60 50 40 1 3 2 4 1 3 2 4 70 60 50 40 1 3 2 4 1 2 3 4 3 5 1 Immersion heater 2 Immersion heater ther mostat 3 Retainer for the temper ature sensor 4 Primary circuit thermo st...

Page 13: ...ectrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance with the applicable standards 3 Use heat resistant cables for the immersion heater con nection Cable di...

Page 14: ...multi functional module 5 3 7 Connecting the control Condition eBUS The thermal cut out for the primary circuit is not used when connecting an eBUS unit Condition 230 V control If you use a 230 V cont...

Page 15: ...et the maximum value 6 4 Filling and purging the product Note It is not permitted to use valves or expansion relief valves for the purging 1 Check whether the drain valve is closed 2 Open the domestic...

Page 16: ...k page of these instructions If you require spare parts for maintenance or repair work use only the spare parts that are permitted for the product 9 Inspection and maintenance 9 1 Observing inspection...

Page 17: ...ion and maintenance instructions 17 11 Customer service To ensure regular servicing it is strongly recommended that arrangements are made for a Maintenance Agreement Please contact Vaillant Service So...

Page 18: ...ng 3 Thermostat set too high 4 Defective thermostat 1 Install a mixer tap 2 Repair the cable 3 Reduce the temperature of the thermostat to 55 C 4 Replace the thermostat Irregular domestic hot water ou...

Page 19: ...eating output solar circuit 19 2 kW Flow rate 900 l h Pressure loss in the heat exchanger heating circuit 10 mbar Volume of the heat exchanger heating circuit 23 l Volume of the heat exchanger solar c...

Page 20: ...SW GB 500 BES 3 way motorised valve 230 240 V 50Hz Thermostat 230 240 V 50Hz IP rating 21 Technical data Material VIH SW GB 500 BES Cylinder material Stainless steel 1 4521 Insulation material Glass...

Page 21: ...Appendix 0020235301_03 uniSTOR Installation and maintenance instructions 21 D Commissioning Checklist...

Page 22: ...UROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is t...

Page 23: ...Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comme...

Page 24: ...product 16 E Electricity 3 F Filling and purging the heating circuit 15 Filling and purging the product 15 Filling and purging the solar circuit 16 Frost 4 H Handing over to the end user 16 I Identifi...

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Reviews: