background image

Installation 5

0020200969_04 Installation manual

35

5.7.3.5 Installing the 87° elbow, 80/125 mm diameter

190 

A  

B  

95 

95 

A

Offset

B

Length of the air pipe

1.

Measure the offset

(A)

, e.g. with 400 mm.

Table of offset dimensions (

Page 35)

2.

Use this value from the table to determine the length of the air pipe

(B)

= 200 mm.

From that, the corresponding flue gas pipe length is calculated as 200 + 40 = 240 mm

Offset

Length of the air
pipe

Offset

Length of the air
pipe

Offset

Length of the air
pipe

190

0

500

300

735

535

195

0

505

305

740

540

200

0

510

310

745

545

> 200 to < 300

not possible

515

315

750

550

520

320

755

555

525

325

760

560

530

330

765

565

300

100

535

335

770

570

305

105

540

340

775

575

310

110

545

345

780

580

315

115

550

350

785

585

320

120

555

355

790

590

325

125

560

360

795

595

330

130

565

365

800

600

335

135

570

370

805

605

340

140

575

375

810

610

345

145

580

380

815

605

350

150

585

385

820

620

355

155

590

390

825

625

360

160

595

395

830

630

365

165

600

400

835

635

370

170

605

405

840

640

375

175

610

410

845

645

380

180

615

415

850

650

385

185

620

420

855

655

390

190

625

425

860

660

395

195

630

430

865

665

400

200

635

435

870

670

405

205

640

440

875

675

410

210

645

445

880

680

415

215

650

450

885

685

420

220

655

455

890

690

425

225

660

460

895

695

Summary of Contents for ecoTEC plus 412

Page 1: ...s systems ecoTEC plus HOME REGULAR HOME COMBI HOME SYSTEM ecoFIT sustain ecoFIT pure GB IE Installation manual Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 49 21 91 18...

Page 2: ...m conditions 9 4 1 Route of the air flue pipe in buildings 9 4 2 Location of the opening 9 4 3 Disposing of condensate 9 4 4 Maximum pipe lengths 9 5 Installation 13 5 1 Installing the connection piec...

Page 3: ...g instructions for all system components installing and fitting the product in accord ance with the product and system approval compliance with all inspection and main tenance conditions listed in the...

Page 4: ...th a downward gradient Downward gradient to the product 3 Note 3 corresponds to a downward gradient of approx 50 mm per metre of pipe length 1 3 5 Risk of fire and damage to electronics caused by ligh...

Page 5: ...EC This Install ation Manual is a component of the certifica tion and is cited in the type testing certificate In compliance with the regulatory statutes of this installation manual the proof of usabi...

Page 6: ...observe the installation instructions for the installed heat generator 2 2 Storing documents Pass these instructions and all other applicable docu ments on to the system operator 2 3 Applicability of...

Page 7: ...elbow concentric 303910 X X X X Pipe clamps 5 x 100 mm diameter 303821 X X X X Adjustable pipe clamps 3 x 100 mm diameter 303935 X X X X Sliding sleeve 303915 X X X X Pitched roof tile 009076 black X...

Page 8: ...em overview 80 125 mm diameter Art no Air flue gas systems concentric 303209 Horizontal roof duct 303200 Vertical roof duct 3 2 1 Components The following table lists the air flue gas systems that are...

Page 9: ...e gas installation opening must comply with the relevant applicable international national and or local regulations Align the opening of the flue gas installation in such a way that ensures a secure o...

Page 10: ...9 0020219530 with 0020219517 and 0020219518 only The maximum concentric pipe length that is specified above is reduced as follows By 0 5 m with the variable terminal By 0 5 m with each metre of VTK pi...

Page 11: ...10 m The inclusion of additional elbows in the flue gas installation reduces the pipe length as follows By 0 5 m for each 45 elbow By 1 0 m for each 87 elbow 4 4 5 Maximum pipe lengths 80 125 mm diam...

Page 12: ...186 6 3 H GB ecoFIT pure 618 VU 256 6 3 H GB ecoFIT pure 625 VU 306 6 3 H GB ecoFIT pure 630 VU 126 6 3 OV H GB ecoFIT pure 412 VU 156 6 3 OV H GB ecoFIT pure 415 VU 186 6 3 OV H GB ecoFIT pure 418 VU...

Page 13: ...ent of ap prox 50 mm per metre of pipe length In doing so note that the air flue pipe must be centred in the wall hole Determine the installation site for the air flue pipe When installing the product...

Page 14: ...from outside of the wall to the centre of the connection piece 5 2 3 Installing the 60 100 mm diameter horizontal wall roof duct article number 0020219517 5 2 3 1 Scope of delivery 65 832 167 65 30 4...

Page 15: ...w 5 30 mm clamp 5 2 4 2 Installing the wall duct 13 3 1 120 336 578 1 Drill a hole Diameter 125 mm Note If the wall duct can be accessed from the exterior of the building you can drill the hole with a...

Page 16: ...age 32 Install the sliding sleeve Page 27 Connect all of the disconnection points with air clamps Page 37 5 3 Installing the direct rear telescopic wall duct article number 0020228140 5 3 1 Scope of d...

Page 17: ...s for the boiler 5 4 Installing terminal kits for 60 100 mm diameter air flue gas systems 5 4 1 Minimum clearances for the flue gas terminal You must comply with the minimum clearances for the flue ga...

Page 18: ...terminal as detaching the terminal damages the latching lugs in the terminal 2 Pull the terminal from the air pipe together with the flue gas pipe A B 3 Release the catch between the opening piece and...

Page 19: ...the event of a change of colour replace the deflector set including the wall collar Page 18 Install the deflector instead of the end pipe on the opening piece Conditions Replacing the end pipe only A...

Page 20: ...ning piece 0 3 Slide the first 87 elbow onto the opening piece until you hear the 87 elbow click into place 5 4 4 3 Installing extensions 1 Install the flue gas pipe from the 87 elbow to the flue outl...

Page 21: ...uting extensions for the variable terminal kit around eaves min 100 mm When installing the variable terminal kit around eaves ad ditional M8 threaded rods are required for the pipe clamps The threaded...

Page 22: ...tives 1 2 Conditions Wall roof duct without extension Install the sliding sleeve Page 27 8 Alternatives 2 2 Conditions Wall roof duct with extension Install the extensions Page 28 Install the 45 elbow...

Page 23: ...ct vertically 5 Secure the roof duct to the roof construction using the fixing bracket 3 6 Connect the roof duct to the product using extensions elbows and if required a sliding sleeve If you do not i...

Page 24: ...ditions Roof duct with extension Install the extensions Page 28 Install the 45 elbow Page 31 Install the 87 elbow Page 32 Install the sliding sleeve Page 27 Connect all of the disconnection points wit...

Page 25: ...oiler to exten sions and elbows 5 5 4 Installing the vertical roof duct 80 125 mm diameter 5 5 4 1 Scope of delivery article number 303200 black 1 2 3 4 1 Vertical roof duct 2 Adaptor air for 110 125...

Page 26: ...connection points with air clamps Page 37 8 Alternatives 2 2 Conditions Roof duct without extension Install the sliding sleeve Page 27 5 6 Installing the concentric connection 60 100 mm diameter to th...

Page 27: ...enings to primary walling or sideways to the wall Observe the specifications provided by the manufacturer of the air flue gas sys tem B A A Air B Flue gas On the air flue gas system establish a connec...

Page 28: ...s using the supplied screws 5 Insert the safety screws 5 7 2 Installing extensions Danger Risk of poisoning due to escaping flue gas The flue pipes of the flue pipework may move as a result of thermal...

Page 29: ...m Minimum length of air pipe extension 100 mm 9 Cut the pipes with a saw panel shears etc 10 After shortening lock the flue pipe 1 inside the air pipe 2 again 5 7 3 Installing elbows white 5 7 3 1 Cor...

Page 30: ...ide a second 87 elbow 2 at a right angle through the wall install the elbow 1 on the top of the boiler at a 3 rotation Connecting extensions with 45 elbows max 5 m max 5 m 90 Install an 87 elbow at an...

Page 31: ...1 460 540 624 660 345 348 465 545 631 665 350 355 470 550 638 670 355 362 475 555 645 675 160 86 280 360 369 480 560 652 680 165 93 285 365 376 485 565 659 685 170 100 290 370 383 490 570 666 690 175...

Page 32: ...Offset B Length of the air pipe 1 Measure the offset A e g with 400 mm Table of offset dimensions Page 32 2 Use this value from the table to determine the length of the air pipe B 190 mm From that th...

Page 33: ...590 365 155 585 375 370 160 590 380 375 165 595 385 380 170 600 390 385 175 605 395 390 180 610 400 395 185 615 405 400 190 620 410 405 195 625 415 410 200 630 420 415 205 635 425 420 210 640 430 425...

Page 34: ...422 510 595 711 715 190 139 310 395 429 515 600 719 720 195 146 315 400 436 520 605 726 725 200 153 320 405 443 525 610 733 730 205 160 325 410 450 530 615 740 735 210 167 330 415 457 535 620 747 740...

Page 35: ...510 310 745 545 200 to 300 not possible 515 315 750 550 520 320 755 555 525 325 760 560 530 330 765 565 300 100 535 335 770 570 305 105 540 340 775 575 310 110 545 345 780 580 315 115 550 350 785 585...

Page 36: ...r pipe 430 230 665 465 900 700 435 235 670 470 905 705 440 240 675 475 910 710 445 245 680 480 915 715 450 250 685 485 920 720 455 255 690 490 925 725 460 260 695 495 930 730 465 265 700 500 935 735 4...

Page 37: ...he flue pipe is dam aged Take care that the flue pipe is not dam aged when drilling 3 Drill holes into the air pipe through the holes in the air clamp 3 Danger Risk of poisoning due to escaping flue g...

Page 38: ...3 mm 2 Use the screw 2 to screw in the air pipes 6 Customer service To ensure regular servicing it is strongly recommended that arrangements are made for a Maintenance Agreement Please contact Vailla...

Page 39: ...G Grease 3 H Horizontal roof duct installing 16 Horizontal wall duct installing 15 Horizontal wall roof duct preparing the installation 13 I Ice formation 4 Installing extensions 28 Installing the 60...

Page 40: ...rbyshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manuf...

Reviews: