Vag ZETA Operating And Maintenance Instructions Manual Download Page 5

VAG Operating and Maintenance Instructions • 5

4.4  Assembly instructions and fittings

The valve is bidirectional and therefore can be installed in any in-

stallation position.
Check the valve for any possible transport or storage damage be-

fore installation. Protect the valve against dirt on site by ade- qua-

te covering until installation.
When the valve is being installed, the functional parts such as the 

stem, stem nut, gasket and knife must be free from dust and dirt.
For the installation of the ZETA

®

 Knife Gate Valve you will need 

adequate load suspension devices (e.g. ring bolt in the blind hole) 

as well as transport and lifting equipment. Lifting the valve for ex-

ample at the handwheel may lead to damage and impairment of 

its function.
When repainting the valve, make sure that no functional parts 

such as the stem, stem nut, gasket, knife or piston rod are cover- 

ed by the paint.
When installing an extension rod to the valve, mount it perpendi- 

cularly to the stem axis above the fixing point.
When installing an extension rod to the valve, mount it perpendi- 

cularly to the stem axis above the fixing point.
When connecting the valve to the pipeline flanges with through- 

holes, use hexagon head screws and nuts with washers on both 

sides from flange to flange.
When connecting the valve to the pipeline flanges with blind th-

read holes, use stud bolts with washers and nuts for a safe and 

reliable installation (see example 3 at fig. 3). Screw the stud bolts 

completely to the ground of the blind thread holes of the valve. 

This guarantees an optimum connection, as the threads are used 

over their whole effective depth. Then align the valve with the flan-

ge by using the stud screws as orientation pins.
Using hexagon head screws in case of blind thread holes can lead 

to leaky connections (see example 1 and 2 at fig. 3).
Fasten the screws carefully and evenly crosswise, thus preven- 

ting unnecessary tensions and cracks or fractures.
The pipeline must in no case be pulled towards the valve. If the 

gap between the valve and the flange is too wide, this should to 

be compensated by thicker gaskets.

We recommend steel-reinforced rubber gaskets accor- 

ding to DIN EN 1514-1 shape IBC for sealing. If the flan- 

ges are crimped, these gaskets must be used.
For the kind and the sizes of the required connection parts 

for each kind of installation (as wafer type in-between two 

flanges or for pipeline end installation), see the following 

tables (Table 1 and Table 2).

Flanges

Wafer-type

Connecting dimensions acc. to DIN EN 

1092-1 Typ 11

Blind thread hole 

l

Through hole 

¡

 

DN

bolt circle 

&

flange outside 

&

thread height 

T

Threaded pin DIN 939

Hexagon nut

DIN 939

Hexagon head 

screw

DIN EN 24014

Hexagon nut

DIN 934

qty

dimension

qty

size

qty

dimension

qty

size

50

125

165

10

8

M16 x 35

8

M16 

-

-

-

-

65

145

185

12

8

M16 x 35

8

M16 

-

-

-

-

80

160

200

12

8

M16 x 40

8

M16 

4

M16 x 120

4

M16 

100

180

220

14

8

M16 x 40

8

M16 

4

M16 x 130

4

M16 

125

210

250

15

8

M16 x 45

8

M16 

4

M16 x 130

4

M16 

150

240

285

15

8

M20 x 45

8

M20

4

M20 x 130

4

M20

200

295

340

15

8

M20 x 45

8

M20

4

M20 x 150

4

M20

250

350

395

17

16

M20 x 50

16

M20

4

M20 x 160

4

M20

300

400

445

22

16

M20 x 55

16

M20

4

M20 x 170

4

M20

350

460

505

22

20

M20 x 55

20

M20

6

M20 x 170

6

M20

400

515

565

26

20

M24 x 60

20

M24

6

M24 x 200

6

M24

500

620

670

30

28

M24 x 65

28

M24

6

M24 x 220

6

M24

600

725

780

32

28

M27 x 70

28

M27

6

M27 x 260

6

M27

700

840

895

27

32

M27x80

32

M 27

8

M27 x 300

8

M 27

800

950

1015

30

32

M30x90

32

M 30

8

M30 x 320

8

M 30

900

1050

1115

30

36

M30x90

36

M 30

10

M30 x 340

10

M 30

1000

1160

1230

33

36

M33x100

36

M 33

10

M33 x 360

10

M 33

1200

1380

1455

36

48

M36x110

48

M 36

8

M36 x 440 

8

M 36

1400

1590

1675

39

52

M39x120

52

M 39

10

M39x500

10

M39

Table  1: Connection parts for flange connection, wafer type

Connection parts for flange connection, wafer type

Lengths of screws are for pre-welded flanges acc. to DIN EN 1092-1, PN 10 type 11, washers acc. to DIN 125 (ISO 7090).DN 50...600: Flat gaskets acc. to DIN EN 1514-

1 / PN 10 / shape IBC, thickness 3 mm; DN 700...1400: Flat gasket according to DIN EN 1514-1 / PN 6 / shape IBC, thickness 8 mm, (flange sealing face PN 6)

T

T

DN 700...1400

DN 50...600

Wrong

Wrong

Right

Picture 3:  Assembly of the VAG ZETA

®

 Knife Gate Valve 

Summary of Contents for ZETA

Page 1: ...KAT B2 2410 Edition 8 30 11 2017 VAG ZETA Knife Gate Valve Version with AUMA electrical multiturn actuator EA Operating and Maintenance Instructions...

Page 2: ...on site 4 4 2 Installation location 4 4 3 Installation position 4 4 4 Assembly instructions and fittings 5 5 Putting the valve into operation 7 5 1 Visual check of the valve 7 5 2 Putting the electric...

Page 3: ...t information adjustment torques etc The screws of the switch mechanism cover are fac tory sealed with sealing wax Breaking this seal by unauthorised opening will result in the loss of warranty 1 Gene...

Page 4: ...nstructions must be observed The control orifice must be positioned in flow direction downstream of the knife The control orifice must be positioned in pressure direction direction of action of the di...

Page 5: ...ween the valve and the flange is too wide this should to be compensated by thicker gaskets We recommend steel reinforced rubber gaskets accor ding to DIN EN 1514 1 shape IBC for sealing If the flan ge...

Page 6: ...300 400 445 22 8 M20 x 55 8 M20 4 M20 x 130 4 M20 350 460 505 22 10 M20 x 55 8 M20 6 M20 x 130 6 M20 400 515 565 26 10 M24 x 60 10 M24 6 M24 x 140 6 M24 500 620 670 30 14 M24 x 65 14 M24 6 M24 x 160 6...

Page 7: ...tch will not work 5 2 4 The electric actuator can only operate the valve over its ent ire length of stroke when the direction of rotation and the polari sation are correct 5 2 5 Operate the valve over...

Page 8: ...roke In case of difficult movement clean and lubricate the stem and knife 6 3 2 Repairing a leak at the outlet of the knife After longer shut down periods the seal may be slightly leaky If leaks persi...

Page 9: ...ng Unit 3 when necessary Under extreme operating conditions the parts mentioned above may have to be replaced more frequently Pos Description KIT 1 KIT 2 KIT 3 1 Body 2 Thrust piece 3 Knife 4 Rising s...

Page 10: ...t solve the problem dismantle the valve dismantle the knife clean it lubricate it replace dama ged parts See also Section 6 1 High operating forces Lateral seal is too tight Evenly unfasten the screws...

Page 11: ...l Reuther Str 1 68305 Mannheim Germany Phone 49 621 749 0 Fax 49 621 749 2153 info vag group com http www vag group com Service Our service hotline can be reached 24 7 world wide In case of emergency...

Page 12: ...Edition 7 12 08 2013 www vag group com info vag group com...

Reviews: