background image

 

INSTALLATION, OPERATION and 

MAINTENANCE 

  

GA Industries Figure 517R   

Rectangular Port Plug Valves

 

INTRODUCTION 

This  manual  will  provide  the  information  to  properly  install, 
operate and maintain the valve to ensure a long service life.   
The  GA  Industries  Figure  517R  Eccentric  Plug  Valves  are 
ruggedly  constructed  to  provide  years  of  trouble-free 
operation with minimal maintenance. 
 

WARNING 

The  valve  is  NOT  recommended  for  use  with 
toxic  or  highly  corrosive  fluids,  fuels  or  fluids 
containing hazardous gases 
 

The  Shop  Order  (SO)  Number,  Figure  Number,  size  and 
pressure rating are stamped on a nameplate attached to the 
valve.  Please refer to the SO number when ordering parts.  
 

FUNCTION

 

Figure  517R  Eccentric  Plug  Valves  are  typically  either  fully 
open  or  fully  closed  to  isolate  pipelines  and  equipment  in 
sewage and wastewater pipelines and treatment plants or on 
sludge  lines  in  water  treatment  plants.    The  valve  can  also 
be  positioned  partially  open  to  throttle  flow.  It  can  be 
manually operated by turning the handwheel or 2

” operating 

nut on the worm gear actuator or automatically by an electric 
motor,  pneumatic  or  hydraulic  actuator.  The  valve  is 
designed  to  accommodate  solids and  other  matter  that  may 
be present in sewage and sludge systems without clogging.  

 

 
RECEIVING AND STORAGE 

Inspect  the  valve  upon  receipt for  damage  during shipment.  
Carefully unload all valves to the ground without dropping.   
 
The  valves  should  remain  in  a  clean,  dry,  and  weather 
protected area until installed. 
 
The  valves  should  be  stored  with  the  plug  partially  open.  
Replace any flange protectors that were removed for receipt 
inspection. 
 

INSTALLATION 

These  valves  are  large,  heavy,  and  awkward  to  handle.  
Ensure  proper  handling  techniques  are  employed.    Handle 
heavy  valves  using  slings  around  the  valve  body  and/or  by 
the  lifting  eyes.    Do  not  lift  by  the  actuators  or  by  slings  or 
chains through the port openings.  
 
Prior  to  installation  ensure  all  debris,  packing  material  or 
other foreign material has been removed from both ports.   
 
Before installing, open and close the valve to ensure proper 
operation.  Close valve before installing in pipeline.   
 
 
 
 
 

 
 
The  valve  is  not  designed  to  support  adjacent  equipment 
and all piping must be supported to avoid imposing stress on 
the valve. Do not 

“jack” mating pipes into position. 

 
The  valve  should  be  oriented  with  the 

“Seat  End”  in  the 

proper  direction.    While  the  valve  can  operate  with  flow  in 
either  direction  it  is  typically  installed  with  the  seat  end  on 
the downstream side of the flow.   
 
When  installed  in  horizontal  pipes  with  fluids  containing 
suspended solids it is preferred, but not necessary, to install 
the  valve  with  the  plug  shaft  horizontal  so  that  the  plug 
rotates up and out of the flow path when open.    
 
When  installed  in  vertical  pipes  with  suspended  solids,  the 
valve should be installed with the seat end on the top side of 
the valve regardless of the flow direction  
 
Ensure  mating  flanges  are  square  and  parallel  to  the  valve 
flanges  before  tightening  flange  bolts.      Prepare  pipe  ends 
according to pipe manufacturer

’s instructions when installing 

mechanical joint end valves.   
 
Do not backfill buried service valves until after the system is 
tested.  
 
Flanged  valves should be  mated  with flat-faced flanges  and 
full-face  gaskets.    If  ring  gaskets  are  used  the  bolt  material 
shall  be  ASTM  A307  Grade  B  (or  equivalent).    Higher 
strength bolting should only be used with full-face gaskets.   
 
Lubricate the bolts or studs and insert around flange.  Lightly 
tighten  bolts  until  gaps  are  eliminated.    Torque  bolts  in  an 
alternating  pattern  in  graduated  steps.    If  leakage  occurs 
wait  24  hours  and  re-torque  the  bolts  but  do  not  compress 
the  gasket  more  than  50%  or  exceed  bolt  maximum  torque 
rating. 
 
Do  not  test  systems  to  pressures  higher  than  the  150  PSI 
rated pressure.    
 
Before  putting  into  service  open  all  valves  completely  and 
thoroughly flush system to avoid damaging the valve seat by 
closing on construction debris. 
 

OPERATION 

The  Figure  517R  opens  and  closes  through  a  90-degree 
“eccentric”  rotation.    During  opening,  the  initial  rotation 
causes  the  rubber  coated  plug  to  pull 

“out  of the seat”  and 

rotation  continues  without  seat  contact  minimizing  wear.   
When fully open the plug is out of the main flow path for low 
headloss  but  can  be  positioned  partially  open  for  throttling 
applications.  During closing, the plug initially rotates without 
seat  contact  but  rotates 

“into  the  seat”  at  the  end  of  travel 

making a tight seal.   

Reviews: