7
4.
SAFETY INSTRUCTIONS
There are no special safety instructions for the equipment.
5.
UNPACKING
Let the equipment acclimatize inside the closed box for at least one
hour at the location where the system
will be installed.
When the equipment is taken out of the box, please leave the special protection supplied with the
equipment if possible in place to avoid any damage.
The special protection should be stored for the unlikely event the equipment has to be sent for repair.
Dispose of the packing material should be done according to the laws of the country where the equipment
is installed, or according to the rules that are applicable on the vessel.
•
Be careful when unpacking the electronic equipment. The content is fragile.
•
Do not press on the Bridge Panel PC.
•
Be careful not to damage any of the connectors, control modules or wiring.
6.
INSTALLATION AND FIRST USE
The SDB-3 and Bridge Panel PC will be delivered with the software and correct data settings installed.
First connect all the inputs and outputs to the components. The power supply wires should be connected
at last.
Note: The Bridge Panel PC turns on automatically when power supply is connected and active.
Check if the inputs are connected correctly through the
Signals
menu.
In case of any errors the connection(s) or connected equipment(s) should be checked and corrected.
6.1 RECORD SDB-3 AND BRIDGE PANEL PC SYSTEM DATA
This information is required when contact the supplier for any reason.
SDB-3 nameplate:
Type No.
SDB-3
Serial No.
Supply voltage
V
Frequency
Hz
Var. No.
Power Cons.
W
Bridge Panel PC info:
Software No.
Serial No.
Hull No.
Delivery date