installation
4
5
installation
Before installing your new mixer, flush through the pipework to ensure removal of
debris, turn off the water supply.
Warning!
Please check for any hidden cables and pipes before drilling holes in the
wall.
The valve must be set into the wall (see dimension page).
If you are fitting the valve to a partition wall or a wall of particularly soft substrate you
will need specialist fixings.
Select the position for the shower valve and offer the shower valve to the wall, mark
the 2 fixing points with a suitable pencil. Remove the shower valve from the wall, drill
the holes to a suitable depth for the wall plugs and secure with suitable screws.
Make all connections to the valve. Connect hot supply to left inlet of the valve and
cold supply to right inlet.
Connect the outlet (top) to the shower.
Slide the cover plate over the valve.
Push the control handle onto the body and secure with the grub screw using the
supplied hexagonal key, fit the screw cover.
Cover
plate
Valve
Control
handle
Grub screw
Cover
42mm
Valve centre line
Valve fixing
holes
22mm
Pipe connection centre line
Hot inlet
Cold inlet
Outlet to shower