background image

  important - please read

  general installation

  

2

  

7

  installers/users notes

Please read these instructions carefully before starting installation and keep for future 
reference.

Remove all packaging and check the product for missing parts or damage before 
starting installation.

Any alterations made to this product and fittings may infringe water regulations and 
will invalidate the guarantee.

The installation must comply with all Local/National Water Supply Authority 
Regulations/Byelaws and Building and Plumbing (UK:BS6700) Regulations.

We strongly recommend that you use a qualified and registered plumber.

These fittings are mixing devices and therefore water supplies must be reasonably 
balanced.

Where connections are made to the mains cold water supply, WRC approved single 
check valves must be fitted to both hot and cold inlets. This is a stated requirement of 
Water Supply (Water Fittings) Regulations 1999 Schedule 2, Section 6 G15.13.2

Before making any inlet pipe connections, all supply pipes MUST be thoroughly 
flushed to remove debris. Failure to do so could result in damage or low flow from the 
mixer unit. Water Supply (Water Fittings) Regulations 1999 Schedule 2 Section 4 G13.1

The fitting of isolating valves to the inlet feeds is advised for ease of maintenance.

Please take great care when installing this mixer not to damage its surface.

Please note if installing in an enclosed environment, access should be left for servicing 
and maintenance. No costs relating to inadequate access can be accepted.

  care of the mixer

Our products are finished to the highest standard and due care needs to be taken to 
ensure their looks are retained.

We recommend cleaning all products with a soft damp cloth ONLY and advise strongly 
against the use of ALL cleaning products i.e. powders and liquids.

If the above instructions are not followed this will invalidate your guarantee in the 
event of a problem occurring.

Summary of Contents for synergie SYN145

Page 1: ... you the completed Guarantee Registration Form Vado accepts no responsibility for any forms lost in the post and returns by registered means is therefore recommended Under this guarantee which is non transferable Vado will at its option repair or replace free of charge any product or replacement part found to be defective The guarantee does not extend to any consequential loss or damage After repa...

Page 2: ...ement of Water Supply Water Fittings Regulations 1999 Schedule 2 Section 6 G15 13 2 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could result in damage or low flow from the mixer unit Water Supply Water Fittings Regulations 1999 Schedule 2 Section 4 G13 1 The fitting of isolating valves to the inlet feeds is advised for ease...

Page 3: ...m 64mm 22mm 99mm 130mm 185mm 90mm Operating Pressure Minimum operating pressure 0 5 bar Maximum operating pressure 5 bar Pull the handle out to increase the flow of water Turn the handle clockwise to increase the temperature and anti clockwise to decrease the temperature 50 75mm ...

Page 4: ...hower valve to the wall mark the 2 fixing points with a suitable pencil Remove the shower valve from the wall drill the holes to a suitable depth for the wall plugs and secure with suitable screws Make all connections to the valve Connect hot supply to left inlet of the valve and cold supply to right inlet Connect the outlet top to the shower Slide the cover plate over the valve Push the control h...

Reviews: