background image

6

7

Installation

Before installing your new mixer, flush 

through the pipe work to ensure removal 

of debris, turn off the water supply.
Ensure the O-ring is in place in the 

bottom of the mixer body.
Position the mixer on the basin. From 

the underside of the basin screw the 

two flexible pipes to the hot and cold 

connections in the mixer body, the hot 

should be to the left and the cold to the 

right, hand tighten only. 
Screw the threaded rod into the small 

hole inside the mixer body.
Slide the rubber and metal washer over 

the rod, the rubber washer should be 

on top. Screw on the nut and tighten to 

clamp the mixer to the basin.  

CAUTION:

 Do not over tighten the nut as 

this may damage the basin.
Connect the water supply to the inlet 

pipes. The hot water should be connected 

to the left pipe and cold to the right.

CAUTION:

 When 

installing the 

flexible hoses 

do 

not

 kink, or bend  

them more than the 

60mm diameter as 

shown right.

60mm

Installation - Quick guide

 

4

 

5

 

3

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

1

2

3

4

0 5

Control 

handle

O-ring

Rubber 

washer

Metal 

washer

Nut

Hot flexible  

pipe

Cold flexible  

pipe

Threaded 

rod

Summary of Contents for AXCES NURI AX-NUR-110-CP

Page 1: ...l AX NUR 110 CP Version 1 1 8 19 VADO Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 www vado com sales vado com MONO BIDET MIXER WITH POP UP WASTE INSTALLATION USER MANUAL KEEP FOR FUTURE REFERENCE NURI ...

Page 2: ...ttings Regulations 1999 and Scottish Byelaws 2004 For further information contact the Water Regulations department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do s...

Page 3: ...8mm 45mm 1 2 42mm 48mm Dimensions Installation Quick guide 1 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 4 5 3 6 2 60mm ...

Page 4: ... the mixer body Slide the rubber and metal washer over the rod the rubber washer should be on top Screw on the nut and tighten to clamp the mixer to the basin CAUTION Do not over tighten the nut as this may damage the basin Connect the water supply to the inlet pipes The hot water should be connected to the left pipe and cold to the right CAUTION When installing the flexible hoses do not kink or b...

Page 5: ...ust the height of the plug as required see Fig 2 Turn on the water supply and turn the mixer on fully to flush through any possible debris from the mixer Finally check all new connections for leaks Adjust the stop to the required position Plug adjustment Vertical control rod Horizontal control rod Ball joint retainer Bearing Control rod link Plug Plug housing Seal Seal Body Fig 1 Fig 2 Operation L...

Page 6: ...ctive SEE NOTE 2 The guarantee whether standard or extended is non transferable to any subsequent owner All claims under the guarantee should be notified in the first instance to our Aftersales department contact details below this must be done no later than the last day of the relevant guarantee period All claims must be accompanied by proof of purchase sales receipt or delivery note from an offi...

Reviews: