background image

13

12

Cleaning instructions

The electroplating on this product is finished to the highest standard. Due care needs 
to be taken to ensure the appearance is retained.  
We recommend cleaning all products with a soft damp cloth ONLY and advise strongly 
against the use of all aggressive/corrosive cleaning products i.e. powders and liquids. 
If these instructions are not followed, this may invalidate your guarantee in the event 
of a problem occurring.

Commissioning

The valve has been factory set under balanced pressures and hot water supply at 65°C. 

When your specific operating conditions are significantly different from the above, the 

temperature of the water may vary from the setting.
When the difference is too great, you can adjust the calibration of the valve to suit 

individual requirements of the installation:
1. Check the temperature of the water being delivered from the outlet with a 

thermometer. 

Note:

 temperature readings should be taken at normal flow rate after allowing for the 

system to stabilise.
2. If the temperature is not 38°C (When the 38º is aligned with the override button) 

proceed to reset the calibration as follows. 

Remove the handle: Prise out the cover, remove the screw and washer and pull off  

the handle and spacer ring. 

Ensure the step on the stop ring is located at 12 o'clock. 

Do not remove the plastic stop ring. Turn the spline of the thermostatic valve clockwise 

to decrease the temperature and anti-clockwise to increase the temperature until 38°C 

is achieved at outlet. 

Note:

 the sensing part of the thermometer probe must be fully submerged in the water 

that is to be tested. 

Replace the spacer and handle making sure that the pin is against the step (see detail).
Once the handle has been attached ensure the temperature does not exceed 46°C when 

turned entirely anti-clockwise.
Your valve setting is now commissioned.

Cover

Screw

Stop ring

Pin

Inside handle

Handle

Override 

button

Valve splines

Step

Spacer ring

Summary of Contents for AXCES BOKX AX-BOK-149T-RRK-CP

Page 1: ...rs model AX BOK 149T RRK CP Version 1 1 8 19 VADO Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 www vado com sales vado com SHOWER COLUMN KEEP FOR FUTURE REFERENCE I...

Page 2: ...egulations department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before mak...

Page 3: ...4 5 Contents of Packaging Handset Riser rail Shower hose with 2 washers Riser arm with wall bracket Shower head with washer Dimensions 950 1150mm 395mm 200mm 150mm 30mm 65mm 25mm 282mm...

Page 4: ...of the riser to suit your requirements This must be done before installing the riser rail Carefully push the riser arm down into the riser rail being careful not to damage the seals Make sure that the...

Page 5: ...riser bracket against the wall slide the bracket down and clip it into the wall bracket fig 2 Finally tighten the grub screw on the side of the riser to secure the riser to the valve fig 3 Fig 1 Rise...

Page 6: ...handset turning the handle away will operate the shower head Hot Cold Handset Shower head Pushing down on this button will override the set temperature Operation Release the handle on the handset hol...

Page 7: ...rom the outlet with a thermometer Note temperature readings should be taken at normal flow rate after allowing for the system to stabilise 2 If the temperature is not 38 C When the 38 is aligned with...

Page 8: ...pending on the water quality filters may become dirty causing reduced flow and inefficient working of the valve Inlet filters Check water has been isolated Undo both locking nuts at the back of the va...

Page 9: ...16 Notes 17 Notes...

Page 10: ...one to our aftersales team Registration must be completed within 6 months from date of purchase Under the extended guarantee period VADO will at its option offer to supply any replacement product or c...

Reviews: