Commissioning (operation)
20901118_EN-US_PC301x VARIO select Serie_V1.3_100720
45
2. Recommendation: Perform preventative maintenance be-
fore storing the pumping unit. This is especially important if
it ran more than 15,000 operating hours.
3. Close the suction and outlet lines, e.g., with the transport
caps.
4. Package the pumping unit such that it is protected from
dust, enclose desiccant if necessary.
5. Store the pumping unit in a cool, dry location.
NOTICE!
If damaged parts are stored for operational rea-
sons, these should be clearly identified as not operational.