
3
PARTS
2-Hole Disposable Bag
Must be installed onto both inlet stems
before use.
See Pg. 8 for details.
Replacement Bags - Part #: HPB2HD
3 pack - Part # HPB2HDPK
Protector Plate (PP101)
This plate should already be installed
in your unit when you receive it, just
below the HEPA bag.
Be sure it is face up, prongs down.
(Pg. 6 for details.)
DO NOT USE AS
A WET VAC
Utility Valve Inlet
Use for “Vacuuming”
Lid
Disposable Bag is located
inside the unit, below the lid.
On/Off switch
Additional tools needed for installation:
• Level
• Rubber Mallet
• Electric Drill
• 1/8” drill bit
(If mounting on block or concrete wall,
you will need masonry bit & plastic or
lead anchors - not provided)
Latches
Low Voltage
Wire Quick Clip
Use if wanting to add
additional valves
See pg 5 for details
Intake
Inlet stem attaches here.
For use when adding
additional wall valves.
Cap inlet stem if not adding valves.
Inlet Stem Cap
Used on end of inlet stem if NOT
running additional valves.
Inlet Stem
Will be inserted into side of
unit if wanting to add addi-
tional wall valves.
See Pg. 6 for details.
SC12
Safety Screen
Located inside unit on top of
protector plate. (See page 6
for details.)
If plumbing in additional inlet valves,
you can use central vacuum tubing or Schedule 40 pipe. If
using Schedule 40, you will need to use reducer coupling when connecting to inlet stem at unit. See
pg 5 for more details and pg 10 for inlet valve kits.
NOTE:
A 20 amp breaker is required for this system.
INSTALLATION QUESTIONS, CALL US AT 1-800-228-0285