background image

ENGLISH

- 12 -

m

 

WARNING:  Always connect the earth cable to the 

mains power earth system. Use the special fastom shown in 
the figure, and a cable with a minimum cross sectional area 
of 2.5 mm

2

VULCAN-24V

ELECTRICAL CONNECTIONS

VULCAN-230V / VULCAN-120V

ENCODER CONNECTION

To connect the encoders please refer to the control unit manual.

m

 

WARNING: For the encoders to work properly it is 

essential that the stoppers inside the case are installed 
correctly.

m

 

ATTENTION: DO NOT use the motor cable channel for 

the sensor cables. 

m

 

ATTENTION: extensions of the cables must be made 

only with a 4x0,22 shielded cable with polyethylene sheath

m

 

ATTENTION: connect the shielding braith sheath to the  

common accessories. Check that the ground of the power 
supply of the accessories is connected to the common 
accessories.

Motor cable

CONTROL UNIT
DX motor

SX motor

YELLOW - GREEN

GND

GND

GREY

COMMON

COMMON

BLACK

OPENING 

CLOSING

BROWN

CLOSING

OPENING

Motor cable

CONTROL UNIT
DX motor

SX motor

BLUE

+

-

BROWN

-

+

SX

DX

EMERGENCY UNBLOCKING

In the case of a power failure, the gate can be unblocked 
mechanically by operating the motor. 

Insert the supplied unblocking lever and rotate 180° clockwise. 
Automation will be automatically restored the first time the motor 
is operated.

Summary of Contents for Vulcan

Page 1: ...Value moves the world ZIS142 IL 245 EDIZ 08 05 2017 VULCAN GB IRREVERSIBLE ELECTROMECHANICAL ACTUATOR UNDERGROUND INSTALLATION FOR LEAF GATES...

Page 2: ...147 5 200 224 343 37 5...

Page 3: ...carefully before installing and programming your control unit This instruction manual is only for qualified technicians who specialize in installations and automations The contents of this instruction...

Page 4: ...00 2 5 x 550 3 x 400 3 5 x 350 2 x 800 2 5 x 550 3 x 400 3 5 x 350 2 x 800 2 5 x 550 3 x 400 3 5 x 350 Power supply V Hz 24 120 60 230 50 230 50 Idling current A 1 3 1 5 1 5 Maximum current absorption...

Page 5: ...oundation box see paragraph about Installation of the stop limit switches INSTALLATION LAYOUT 1 1 2 4 3 C 5 D A B LENGTH OF THE CABLE 10 metres from 10 to 20 metres from 20 to 30 metres Power supply 2...

Page 6: ...Install a conduit for the electrical cables and another for drainage 4 Embed the foundation box in concrete ensuring it is level and plumb mWARNING ensure that the concrete used is properly cured pri...

Page 7: ...attach the limit switch screw as shown in the figure 2 Place the gate in the maximum open position and then attach the limit switch nut as shown in the figure and tighten the screw 3 Mount the motor c...

Page 8: ...TION extensions of the cables must be made only with a 4x0 22 shielded cable with polyethylene sheath mATTENTION connect the shielding braith sheath to the common accessories Check that the ground of...

Page 9: ......

Reviews: