F) - Loosen the discharge screw

Once the operator is mounted on the supports, turn
the discharge screw (1) once to allow the correct
operation of the hydraulic system.

m

If you have to dismount the operator from its

supports, first tighten the discharge screw in order to
prevent the hydraulic fluid from leaking.

G) - Mount the gland and introduce the cable

1.

Introduce the cable (3) through the gland PG11 (1).

2.

Position the gland in the end cap (4) and attach
using the nut PG11 (2).

MANUAL OPERATION

In the event of need, the gate may be operated manually. 
In locked models, it is necessary to first run the
unlocking mechanism.

Unlock for manual operation

1.

Lift the top and introduce the key (1) in the
unlocking screw (2).

2.

Turn the unlocking key in any direction until it is
perpendicular to the operator piston rod. 
The operator is unlocked.

3.

The gate can now be moved manually.

Locking for automatic operation

1.

Lift the top and introduce the key (1) in the
unlocking screw (2).

2.

Turn the unlocking key in any direction until it is parallel 
to the operator piston rod. The operator is locked.

3.

Remove the key and close the lid.

Summary of Contents for URSUS Series

Page 1: ...OR HIDR ULICO PARA PUERTAS BATIENTES ACCIONADOR HIDR ULICO PARA PORTAS BATENTE HYDRAULISCHER ANTRIEB F R DREHT REN HYDRAULISCHE AANDRIJVING VOOR DRAAIHEKKEN I GB F E P D NL IL n 363 EDIZ 21 01 2013 V2...

Page 2: ......

Page 3: ...identified and resolved prior to resetting In the case of faults that cannot be resolved using the information to be found in this manual consult the V2 customer assistance service V2 declines all re...

Page 4: ...Group 3 Anyone can use the automated closure which is thus located on public land For example the access gate to a supermarket or an office or a hospital Protection A Closure is activated by means of...

Page 5: ...n closing URSUS A33 230V irreversible for leaves up to 4 m shock absorber in closing URSUS A41 230V reversible for leaves up to 6 m shock absorber in closing URSUS A43 230V irreversible for leaves up...

Page 6: ...upply cable 2 x 1 mm2 antenna cable RG58 4 Photocells cable 4 x 0 5 mm2 RX cable 2 x 0 5 mm2 TX 5 Key switch cable 2 x 1 mm2 6 Transmitter 7 Pillar photocells cable 4 x 0 5 mm2 RX cable 2 x 0 5 mm2 TX...

Page 7: ...5 150 80 1110 95 220 155 80 1105 100 175 190 80 1070 110 190 155 80 1105 INSTALLATION MEASURES To carry out a proper installation of the operator parts as well as to ensure the best automation perform...

Page 8: ...35 80 735 110 95 125 80 735 URSUS 41 URSUS A43 A B mm C mm D mm E mm 80 200 235 80 870 85 180 230 80 870 90 165 225 80 870 90 195 200 80 870 95 160 215 80 870 100 140 215 80 870 110 140 195 80 870 INS...

Page 9: ...not make the whole travel meaning the mechanical slow down system will not work 2 Weld the support brackets 3 and 4 to the supports 1 and 2 mCarry out the welding with the operator withdrawn and at a...

Page 10: ...ure the ball bearing joint using the safety washer 3 4 Lock the safety nut 4 against the servo motor spindle D Mount the operator on the rear support 1 Introduce the gudgeon 1 in the support 2 2 Posit...

Page 11: ...using the nut PG11 2 MANUAL OPERATION In the event of need the gate may be operated manually In locked models it is necessary to first run the unlocking mechanism Unlock for manual operation 1 Lift th...

Page 12: ...power power supply switch mBefore carrying out any gate movement ensure there is no person or object in the radius of action of the gate and the drive mechanisms 5 Use the control unit pushbuttons CLO...

Page 13: ...ng force is more exactly the force during the retraction of the piston rod In inward opening installations it corresponds to the opening operation In outward opening installations it corresponds to th...

Page 14: ...al and in accordance with current legal and regulatory provisions The recommended interval between each maintenance operation is six months the checks involved should at least relate to the perfect ef...

Page 15: ......

Reviews: