5.5 - PHOTOCELLS
The control unit considers two kinds of photocells, depending on
the terminal to which they are connected:
Photocell 1
Photocells installed on the gate inner side, which are active both
during the opening and the closing phase.
When photocells 1 operate, the control unit stops the gate; as
soon as the photocell beam is free, the control unit will open the
gate completely.
m
WARNING: Type 1 photocells must be installed so that
they completely cover the opening area of the gate.
Photocell 2
Photocells installed on the external gate side and which are active
during the closing phase only.
When photocells 2 operate, the control unit opens the gate
immediately, without waiting for release.
The control unit supplies a 24Vac power supply to photocells and
it can perform a photocell operation test before starting the gate
opening phase.
NOTE
: Photocell power terminals are protected by an electronic
fuse that stops current in case of overload.
m
WARNING: the sensor cables must not be run in the
same conduit as the motor cables.
• Connect power supply cables of photocells transmitter
between terminals
Z3
and
Z2
of the control unit.
• Connect power supply cables of photocells receiver between
terminals
Z1
and
Z2
of the control unit.
• Connect the N.C. exit of the photocell receivers of the 1 type
between terminal boxes
L7
and
L11
C
To activate the functions, change the
Fot1
parameter
settings
• Connect the N.C. exit of the photocell receivers of the 2 type
between terminal boxes
L8
and
L11
C
Function is active in closing and with gate standing
(closed). To change the operation, set parameter
Fot2
in the programming menu.
m
WARNING:
• if several couples of same kind photocells are mounted, their
outputs must be connected in series.
• In case of reflection photocells, power supply must be
connected to terminals
Z3
and
Z2
of the control unit to carry
out the operation test.
L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11
TX
RX
FOT2
FOT1
Z1 Z2 Z3 Z4 Z5 Z6