
19b
1a
11c
19a
18
1b
11a
15)
N
S
F
17)
18)
19)
20)
Unscrew the adjustment screw counter nut (1b) and the adjustment
screw (1a) for at least 10 turns;
Close the fifth wheel and assemble on the traction spring (18);
Reassemble the fifth wheel back onto its pedestals, as per directions at
steps 6 and 8 in section 7.1.1 FIFTH WHEEL WITH RUBBER BEARINGS on
Proceed with steps 7, 8, 9, and 10 in section 5.1 CLEARANCE
Load mechanism lock and couple up the semi-trailer as per directions
in section 3.1 - COUPLING UP at page 14/36.
Screw in nuts (11c) and (19a) pack-tight with relative screws (11a) and
(19b),
REV. 00
CHAP. 7
PAG.
32/36
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
FIFTH WHEEL Rp10