11
Step 5
Install the cable over the channel bar pulley
• Plug in the motor hoist (B) to the nearest 120 volt
power outlet.
• Use the hand control switch and safely lower the
cables until 9 feet of cable is visible.
• Unplug the power cord from the outlet.
• Temporarily remove the pulley at the end of the
spacer channel pulley bar (D)
(use pliers to remove
the cotter pin then remove the clevis pin to release
the pulley)
(SEE FIG. 7A & 7D)
• Place the cable coming out of the rectangular opening closest to the spacer channel bar
(indicated by arrow in figure 7B)
over the op of the pulley at the end of the spacer
channel pulley bar.
(SEE FIG 7B & 7C)
CAUTION: Use care when handling the cables - frayed or rough spots on the cable
could cause injury.
• Once the cable has been placed over the pulley reinstall the pulley to its original postion,
insert the clevis pin and refasten the cotter pin.
(SEE FIG 7D)
Summary of Contents for Garage Gator GGR125
Page 17: ...17 ...