WWW.UTOPIAGROUP.COM
page 34
A
A
B
E
C
D
C
C
C
2mm gap
2mm gap
Symmetry Bath Panel with End Storage Unit
SYMMETRY BATHS
Please note - remove all protective film from panels before fixing them together.
Ensure the under side of this bath rim is fitted at a height which will give the required
clearance for the panels and/or a bath end storage unit when fitting. Check that the floor is
level so it doesn’t impede the bath end storage unit door.
BATH SIDE PANELS WITH A TOP RAIL.
The top rail should be fitted first around the under side of the bath rim with the desired
amount of rail showing and fixed to the timber under the bath rim.
FITTING BATH SIDE PANEL WITH END STORAGE UNIT
Fix the 3 bath side panels together with the blocks and screws provided ensuring there is
a 2mm space between each panel
(see fig 1 A)
, and the 5mm feet are to the floor, add
two self adhesive stops to the top of each panel these afford enough clearance to allow
the storage unit door to open freely. The storage unit will be fitted with a 10mm high foot
which allows the unit door to clear the floor when opened.
Fit the adjustable foot at the base of the centre panel
(see fig 1 B)
, to support the panels.
Fit the keku clips as shown
(see fig 1 C)
, ensuring that they line up correctly on the top rail
and panels. Fix an L bracket to the underside of the top rail
(see fig 1 D)
, which will act as
a stop. Fit another L bracket to the wall approximately 100mm from the floor level where
the back of the side panel final position will be
(see fig 1 E)
.
Slide the End Storage unit into position. Do not fix it at this stage.
Slide the assembled panels onto the keku clips until they positively engage.
Adjust the End Storage unit until the door is in the desired position.
The End Storage unit can then be screwed to the top rail from the inside of the unit and
fixed to the back wall.
Keku clip
Transit support. This should be
removed prior to installation by
cutting at the pre-marked “V” cuts
Keku clip
Bracket fixed to
top rail only
Top Rail
fig 1
Summary of Contents for Downton series
Page 1: ...Bathroom Installation Instructions...
Page 29: ...WWW UTOPIAGROUP COM page 29 Free staning Bath...
Page 30: ...WWW UTOPIAGROUP COM page 30 fig 1 fig 2 Assembly...
Page 31: ...WWW UTOPIAGROUP COM page 31...
Page 43: ...WWW UTOPIAGROUP COM page 43...
Page 44: ...WWW UTOPIAGROUP COM page 44...
Page 45: ...WWW UTOPIAGROUP COM page 45 For Fitting Basins and Worktops see page 49...
Page 46: ...WWW UTOPIAGROUP COM page 46 For Fitting Basins and Worktops see page 49...
Page 47: ...WWW UTOPIAGROUP COM page 47...
Page 48: ...WWW UTOPIAGROUP COM page 48 For Fitting Basins and Worktops see page 50...
Page 49: ...WWW UTOPIAGROUP COM page 49...
Page 50: ...WWW UTOPIAGROUP COM page 50...
Page 51: ...WWW UTOPIAGROUP COM page 51...
Page 53: ...WWW UTOPIAGROUP COM page 53 Modular 2017 Star Lustre Opula e used ed...
Page 54: ...WWW UTOPIAGROUP COM page 54...
Page 55: ...WWW UTOPIAGROUP COM page 55...
Page 56: ...WWW UTOPIAGROUP COM page 56...
Page 57: ...WWW UTOPIAGROUP COM page 57...
Page 58: ...WWW UTOPIAGROUP COM page 58...
Page 59: ...WWW UTOPIAGROUP COM page 59...