WWW.UTOPIAGROUP.COM
page 22
i-Line Wall and Frameless Mirror Unit
i-Line Modular Units
FITTING WALL UNITS
See page 9 of these instructions.
FITTING AN i-LINE FRAMELESS MIRROR UNIT
The frameless mirror is held onto the backboard with an integrated 50mm side panel with
two keyhole grommets. Remove the mirror by carefully lifting it up and away from the back-
board and put to one side.
Put the Backboard into position and fix to the wall using appropriate fixings,
(see fig 1
).
Replace the mirror onto the backboard before fixing the 50mm flyover panel.
Screw the 50mm side panel near the front through the top and bottom panels using 3”
screws and cover caps (supplied),
(see fig 2
) and
(see fig 2A
).
FITTING SUGGESTION
To help fitting we suggest that you fit i-Line wall configurations in the following order:
1. Wall units and 50mm side panel
(see
fig 3 A).
2. 50mm i-Line shelf that runs under the units
(see fig 3 B).
3. i-Line mirror unit with 50mm side panel
(see fig 3 C).
4. 50mm i-Line flyover that runs over the units
(see fig 3 D).
I-LINE MODULAR UNITS
See page 14 for the fitting of wall hung modular units.
Twin units will need to be screwed together. The 50mm x 100mm base rail is screwed from
the under side of the units with the 2 ½” screws supplied. Use the 1 ¼” screws to fix into
the 50mm side panels. The 1” screws are to screw the two units together. All screws can
now be capped. FIx the worktop in the usual manner.
fig 1
fig 2
fig 2a
see also
fig 2a below
fig 3
A
A
B
C
D
front edge
screw position
centre of panel
25mm
50mm mirror
side panel
INSTALLATION INSTRUCTIONS
Summary of Contents for Downton series
Page 1: ...Bathroom Installation Instructions...
Page 29: ...WWW UTOPIAGROUP COM page 29 Free staning Bath...
Page 30: ...WWW UTOPIAGROUP COM page 30 fig 1 fig 2 Assembly...
Page 31: ...WWW UTOPIAGROUP COM page 31...
Page 43: ...WWW UTOPIAGROUP COM page 43...
Page 44: ...WWW UTOPIAGROUP COM page 44...
Page 45: ...WWW UTOPIAGROUP COM page 45 For Fitting Basins and Worktops see page 49...
Page 46: ...WWW UTOPIAGROUP COM page 46 For Fitting Basins and Worktops see page 49...
Page 47: ...WWW UTOPIAGROUP COM page 47...
Page 48: ...WWW UTOPIAGROUP COM page 48 For Fitting Basins and Worktops see page 50...
Page 49: ...WWW UTOPIAGROUP COM page 49...
Page 50: ...WWW UTOPIAGROUP COM page 50...
Page 51: ...WWW UTOPIAGROUP COM page 51...
Page 53: ...WWW UTOPIAGROUP COM page 53 Modular 2017 Star Lustre Opula e used ed...
Page 54: ...WWW UTOPIAGROUP COM page 54...
Page 55: ...WWW UTOPIAGROUP COM page 55...
Page 56: ...WWW UTOPIAGROUP COM page 56...
Page 57: ...WWW UTOPIAGROUP COM page 57...
Page 58: ...WWW UTOPIAGROUP COM page 58...
Page 59: ...WWW UTOPIAGROUP COM page 59...