UTICA BOILERS BC3095 Installation, Operation & Maintenance Manual Download Page 4

4

Table 2  RATINGS & DATA

Boiler Model 

Number

(1)

AHRI Oil Burner 

Input

(1)

Heating 

Capacity 

MBH

(4)

AHRI Net 

Ratings

(2)(4)

A.F.U.E. 

Rating

Min. Natural Draft 

Chimney Size

G.P.H. MBH

(4)

Water MBH

Round

Square

BC3095

0.95

133

114

99

84.0

6

8x8x15

BC4100

1.00

140

121

105

85.0

6

8x8x15

BC4115

1.15

161

137

119

84.0

6

8x8x15

NOTES:

1. AHRI burner capacity is based on an oil heating value of 140,000 Btu/gal and with 13%  

CO

2

.

2. Net AHRI Water Ratings shown are based on a piping and pickup allowance of 1.15.

3. Consult manufacturer before selecting boiler for installations having unusual piping and 

pickup requirements, such as intermittent system operation, extensive piping.

4. For forced hot water heating systems where boiler and all piping are within the area to 

be heated, select boiler on basis of its Heating Capacity.

5. Nozzle listed for use with Beckett Burner. 

6. Electrical service to be 120 Volts, 15 Amps, & 60 Hz.

STANDARD EQUIPMENT: Crated Boiler, Flush Jacket, 

Oil Burner, Target Wall/Liner, Circulator-1¼", Safety 

Relief Valve, Temperature Pressure Gauge, Drain 

Valve, Wiring Harness, Supply Tapping 1¼", Return 

Tapping 1¼", High Limit and Circulator Control, 

Primary Control.  For Tankless Heater Units-add Low 

Limit. 

Table 3  TANK-LESS WATER HEATER CAPACITIES

Boiler 

Model 

Number

Input 

Rate 

G.P.H.

Tankless 

Heater 

Number

Tankless Heater 

Capacity Intermittent 

Draw G.P.M.

Boiler        

Water 

Content 

(Gallons)

BC3095

0.95

L-24

3.25

6.7

BC4100

1.00

L-24

3.25

8.2

BC4115

1.15

L-24

4.00

8.2

RATINGS, DATA, AND DIMENSIONS

Summary of Contents for BC3095

Page 1: ...BOILER INSTALLATION OPERATION MAINTENANCE MANUAL An ISO 9001 2008 Certified Company Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com Models BC3...

Page 2: ...other flammable vapors and liquids DO NOT obstruct air openings to the boiler room Modification substitution or elimination of factory equipped supplied or specified components may result in personal...

Page 3: ...NS Table 1 DIMENSIONS Boiler No Length of Flush Jacket Front of Jacket to Center Line of Flue Outlet Flue Outlet Diameter Tankless Coil to Back of Jacket A B C D BC3 19 9 6 8 BC4 23 11 6 12 Figure 1 D...

Page 4: ...n extensive piping 4 For forced hot water heating systems where boiler and all piping are within the area to be heated select boiler on basis of its Heating Capacity 5 Nozzle listed for use with Becke...

Page 5: ...ion system as practical Allow 24 inches in front top and right hand side for servicing and cleaning or removing tankless water heating coil When installed in utility room door should be wide enough to...

Page 6: ...one starting 12 inches from the top and one 12 inches from the bottom of the enclosed space Each opening shall have a minimum free area of 1 square inch per 1 000 BTU per hour of the total input rati...

Page 7: ...d each opening shall have a minimum free area 1 square inch per 2 000 BTU per hour total input rating of all appliances in the enclosed space See Figure 5 D When ducts are used they shall be of the sa...

Page 8: ...as suggested in Figure 6 When the boiler is used in connection with refrigerated systems A Chilled medium MUST BE IN PARALLEL with boiler B Use appropriate valves to prevent chilled medium from enter...

Page 9: ...o fit the system or condition of the installation Although this method of piping is not typically required for baseboard heating systems A This method is used to protect systems using radiant panels a...

Page 10: ...10 CONNECTING SUPPLY AND RETURN PIPING Figure 9 Bypass Piping Option Used to Protect From Converted Systems With High Water Temperature Figure 10 Typical Installation With Circulators...

Page 11: ...11 CONNECTING SUPPLY AND RETURN PIPING Figure 11 Typical Installation With Valves Figure 12 Typical Installation With DHW...

Page 12: ...ety relief valve outlet and downstream of union if used Terminate pipe with plain end not threaded Refer to local codes and appropriate ASME Boiler and Pressure Vessel Code for additional installation...

Page 13: ...sitive pressure in the combustion chamber Horizontal portions of venting system should not exceed 10 ft in length Horizontal lengths over 10 ft will have negative effect on chimney performance Chimney...

Page 14: ...ended E Compression fittings on suction line often allows air to be drawn into fuel pump making it difficult to maintain oil pressure at the nozzle F Do not run overhead fuel lines from tank to oil bu...

Page 15: ...an inside wall about four feet above the floor 2 NEVER install a thermostat on an outside wall 3 Do not install a thermostat where it will be affected by drafts hot or cold pipes sunlight lighting fi...

Page 16: ...16 WIRING DIAGRAMS Figure 18 Wiring Diagram...

Page 17: ...limit literature for additional information B Burner delay by passed for tankless heat call for heat Burner ignition begins immediately Burner and circulator operation continues until thermostat stops...

Page 18: ...limit point Burner should start B Verify Primary Control and Flame Sensor Flame Failure simulate by shutting off oil supply with hand valve while burner is on Sixty seconds after flameout safety swit...

Page 19: ...ure 17 page 13 5 Disconnect oil line from burner Recommend replacing nozzle at start of each heating season Lubricate burner motor and circulator motor if required with few drops of good grade of ligh...

Page 20: ...ERVICE RECORD Date Nozzle Pump Pressure PSI Smoke Draft CO2 or O2 Flue Temp F Size Angle Type O F INF Controls and Safety Devices X Nozzle Size Angle Type Pump Pressure Vacuum Line Voltage Motor Amps...

Reviews: