DS1043-103M
11
LBT8039
INSTALLATION
BOX WALL INSTALLATION
To install the power supply equipment proceed as follows:
1. Remove the front lid by unscrewing the 4 screws on the front and on the top (Figure 1)
Figure 1 - Lid opening
2. Before installing the box base on the wall using three bolts, insert the power supply cables in the hole and the
cables for connection with devices to be powered and fault signal control devices in the back slit. Leave at least
a 50 m. cable for connections (Figure 2).
Figure 2 - Box installation
Hole for fixing bolt
Hole for fixing bolt
Hole for fixing bolt
Hole for power
supply cables
Slit for cables