Step
05
A
ss
em
bl
y
In
st
ru
ct
io
ns
R
ou
nd
-T
op
S
ta
nd
-U
p
C
oo
p
V2
M
ar
ch
4
, 2
01
7
C
op
yr
ig
ht
®
U
rb
an
C
oo
p
C
om
pa
ny
a
ll
rig
ht
s
re
se
rv
ed
.
Fr
on
t &
A
rcs
Fig 5
Fig 5A
:-) Find your step ladder again!
26½ I
nches
D4 Valance
D3 Valence Holder
D2 Door
A21 Arc
A21 Arc
A10
A11
A7
A8
Attach Same As Previous Steps
H6 Stake
5.1 Attach Left & Right Run Fronts:
Using
E1
Brown Screws into pre-
drilled holes as of
A1, A2 & A3
Panels, attach left side
A7
and
A8
panels
as illustrated in
Fig 5
making sure to keep edges and bottom of panels
flush. Repeat for right side
A10
and
A11
panels too. Install latch
hardware as in previous steps on panel
A7
.
5.2 Front & Back Arcs:
Using
E1
Brown Screws into pre-drilled holes
under top rail of
A8
&
A11
attach
A21
Arc on top of
A8
&
A11
moving left
and right sides of coop in or out as required to make left, right and front
edges line up. See
Fig 5.
There should be
~ 26½
inches between left &
right sides. Repeat back
A21
Arc on top of
A20
panel driving
E1
screws
up into bottom rail of Arc from top rail of
A20
.
5.3 Square Up Coop:
Using a measuring tape measure the inside
dimensions of coop corner-to-corner. It should be
about 83 inches
.
Most importantly, it should be the
equal
corner-to-corner. "Rack" the
coop corner-to-corner as needed to make the measurement equal.
5.4 Stake Down Front:
Position
A7
and
A10
Front Panels In/Out to
where there is
~ 26½
inches between left & right sides at ground level.
When correct, drive Stakes through holes in bottoms of
A7
&
A10
where
indicated by
Gold Arrows
to stake down the bottom edges of front door
opening. See
Fig 5.
5.5 Storage Door & Valance:
Position
D2
Door on top of Storage Area
as indicated in
Fig 5A
and using
E1
Brown Screws attach door frame on
left and right sides by aligning with edges of coop and driving screws
from frame into side panels of coop. Place
D3
Valance Holder Board on
top of
D2
Door Frame aligning side to side and edges, and drive
E1
Screws up through
D2
Door Frame top edge into bottom of
D3
. Place
D4
CoroClear® Valance Panel into slot of
D3
.
A1
A2
A3
A20 Back
Banel
Flush
Measure Before
Staking Down
+/- Inside Corner to Corner