Step
03
A
ss
em
bl
y
In
st
ru
ct
io
ns
R
ou
nd
-T
op
S
ta
nd
-U
p
C
oo
p
V2
M
ar
ch
4
, 2
01
7
C
op
yr
ig
ht
®
U
rb
an
C
oo
p
C
om
pa
ny
a
ll
rig
ht
s
re
se
rv
ed
.
R
oo
st
F
ro
nt
&
E
gg
Bo
x
Asse
m
bl
y
Fig 3
3.1 Someone Holding For You:
Using
E1
Brown Screws attach
C1
Egg Box Face Panel to middle vertical post of
C2
Egg Box Access Door Panel driving screws from C2 middle post
into C1 edge. Now attach
D1
Storage Floor on top (wire side down) making sure back edge of
C1
is flush with cross piece on
D1
wooden area. Screw in from
C2
into
C1
and from
D1
into top edge of
C1
.
3.2 Install Egg Box Floors:
Using
E1
Brown Screws attach the lower
C3
Egg Box Floor (wire side down) tight into the corner formed from the
C2
Panel and
C1
Panel attaching from
C2
into
C3
edge and
C1
into
C3
edge. Repeat for upper
C3
Floor noting the alignment with
C2
and
C1
as illustrated in
Fig 3 & 3A
.
3.3 Install Door & Apron:
Place
B2
Door Panel into place as illustrated making sure edges are flush and attach using
E1
screws from positions shown. Some screws are behind door.
Attach
B3
Apron Panel (logo) in the same way in the position shown.
Double check that all screws are in and edges are flush.
3.4 Storage Door Window Bolt:
Using 4 small Philips head screws included with the
H8
Window Bolt, install the bolt portion of the hardware in the center of the
D1
panel front (as
illustrated) into the pre-drilled holes. Discard the retainer portion of the window bolt.
Fig 4A
:-) Can we get some help here?
Wire Down
Floor Aligned
With Cross
Piece On
Front
Floor Flush With Bottom
Open Door To Access Screw Holes
All Edges Flush
Edges Flush
C1
C2
C3
C3
B2
B3
D1
Align With
Cross
Piece
C1
Fig 3A
Assembled As A Unit
Then Fitted Into Place
In Step 4
C1 Flush Here
Wire Down
Wire Down
H8