Egg Box Placement & Roof Install

9

(2) 2x E1 Screws
Each Side

5 E3 Screws

(1)

 Fit egg box assembly to back roost wall B2 and attach with 4 E1 screws through pre-drilled side holes in B2. 

(2)

 Slide egg box 

roof panel C4 through slot in back side of B2 until notches in panel meet up with supports. 

(3)

 Using 2 E3 screws secure top of 

roof in two positions. 

(4)

 Before screwing down bottom edge of roof, rack door end of eggbox left or right to make overhang on 

each side of roof equal then drive 1 E1 screw up at an angle through top of leg that is near corner of eggbox, into eggbox door 

frame, locking eggbox into place. Make sure egg box door swings down clear of leg post. 

(5)

 Finally, screw in bottom 3 E3 roof 

screws, screwing down into C3 egg box door top rail.

B2

C4

© Urban Coop Company, all rights reserved.

Storage/Planter Area Fence

10

14

Set back storage area long piece D3 between legs A8 and egg box side fence board D2 and roost side board 

D1 in place as shown.  Drive one E1 brown screw from outside leg A8 through fence boards and into block 

that is attached to D3. Repeat for other side. Drive a screw through the blocks on D1 & D2 into roost and 

eggbox to hold sides in place. D1 and D2 are reversible so that they can be used regardless of how you orient 

your roost box.

E1 Screw

E1 Screws

D3

A8

D1

D2

Optional 
Waterer
Shown.

(5) E1 screw to lock 
egg box in place.

C3

Roof panel
top edge with
E3 Screw.

Roof panel
bottom edge
with E3
screws

Skip this step if you ordered a planter box. See section 

Summary of Contents for Backyard Chicken Coop

Page 1: ...options you order the more important this becomes as these coops are quite large and you may become confused by panels that look similar You should expect extra fasteners to be left over In the rare o...

Page 2: ...py healthy hens Placement Easy access to water and clear access to egg door and roost door is recommended Flat level high ground is best Some sunlight is not all bad The Galvalume roof does a good job...

Page 3: ...Rail Is Wide Holes In Panel Ends No Wire A6 Top Run Extender Panel A8 Rear Legs 4 holes in Each top is beveled A9 Header Board long 2x4 with 2 holes in each end A10 Ramp Door A7 Front Legs have notch...

Page 4: ...of Supports 2x B7 Eave Boards 2x B6 Roost Bars 2x Door B8 Roost Roof Panels 2x C4 Roof Panel Egg Box C1 C2 Left and Right Side of Egg Box C3 Egg Box Door Assembly Door D1 Roost Side shorter D2 Egg Box...

Page 5: ...A9 Header Board A7 Front Leg E4 Wire on all lower panels faces inward Wider edge on tops Wider edge on tops Wider edge on tops Run Assembly 1 Assemble Sides Pick a level place for assembly With wire...

Page 6: ...or out as needed to allow metal pins on brackets at bottom of legs to fit into holes on bottom rail of panel Rack the entire assembly from side to side if needed to make the gap on either side of the...

Page 7: ...edge flush Rack frame to line up edges then install E1 screws 3 and 4 Optional waterer brackets are in corners Screw 1 Screw 2 Screws 3 4 E1 brown screws into pre drilled holes Urban Coop Company all...

Page 8: ...the nail in door frame that holds it in place during shipping Before lifting roost onto run place B8 roost roof panels to where the grooves overlap with pre drilled holes on B4 center roof support an...

Page 9: ...clear of leg post 5 Finally screw in bottom 3 E3 roof screws screwing down into C3 egg box door top rail B2 C4 Urban Coop Company all rights reserved Storage Planter Area Fence 10 14 Set back storage...

Page 10: ...roost panel B1 using screws in latch kits Remove nail or screw in side of door frame that holds door in place for shipping You will need to squeeze latch body together a little for holes to line up N...

Page 11: ...t and puddling occurs nipple may have been damaged or it may be clogged with debris Clean and inspect the nipple and if you still have the problem contact us and we will get you a new nipple sent out...

Page 12: ...ordless Drill The Run Extension replaces the removable panel A3 of your coop and becomes a rigid removable sub assembly of your coop that attaches and detaches as a unit Panel A3 gets used in your Run...

Page 13: ...he header board Run Extension continued Run Extension continued 12b 12a Step 4 Install provided karabiner clip onto closed hasp on both sides to securely attach run extension onto your coop This allow...

Page 14: ...he end blocks on the outside of your coop by driving 1 screw down through each mid block into frame of extension with edges flush Use the Gold T20 screws to secure ends of boards by driving 2 screws i...

Page 15: ...r Coop 2 so that the frames are sitting back to back as illustrated in Fig 13a on next page see steps 1 3 Step 13 2 Attach Thru Panel Attach Thru panel R2 to back edges of side panels A1 of Coop 1 usi...

Page 16: ...Shown with optional run extensions installed...

Page 17: ...6 R2 Ranchette Run Assembly Illustration 13a R3 R3 Run Extension or Panel A3 Goes On Ends of Coop Run Extension or Panel A3 Goes On Ends A5 A5 A4 A4 A9 A9 A1 A1 A1 A1 R1 Narrower of the 2 Fill Panels...

Page 18: ...d the P5a side board on the side of the planter that has the roost door Use the P9 gauge block to correctly space the top of the box and mount the P5 and P5a boards using 4 P4 screws in each side maki...

Reviews: