3. Service and Repair
3-6
Main Relief Valve
Figure 3-4: Hydraulic Manifold Assembly, Front View
Counterbalance Valves
1. Operate the work platform for 10-15 minutes to bring the hydraulic oil up to normal operating temperature.
2. Remove the gauge port cap and install the pressure gauge assembly.
3. Using two 1-ton jack stands and a 2-ton jack, jack the work platform up to raise the rear wheels off the
ground and block the machine securely.
4. Loosen the locknuts on Counterbalance Valves.
5. With the machine fully powered up depress the
DRIVE
button on the upper control box, depress the
interlock lever and slowly pull the control lever to
REVERSE
to drive the wheels.
6. Adjust the Forward Counterbalance Valve by turning the adjustment screw until the pressure gauge
indicates 34.5 bar (
500 psi
).
7. Slowly push the Control Lever to
FORWARD
to drive the wheels.
8. Adjust the Reverse Counterbalance Valve by turning the adjustment screw until the pressure gauge
indicates 34.5 bar (
500 psi
).
9. Check the settings by slowly moving the Control Lever
FORWARD
, then
REVERSE
, checking the gauge to
ensure pressures are properly set. Re-adjust as needed.
10. Tighten locknuts on valves to 8N-m (
6 ft-lbs
). Remove blocks and lower work platform to ground.
11. Remove the gauge from the gauge port and re-install cap.
12. Check for proper operation of the drive system and brake.
Fore/Aft Tilt Cylinder Relief Valve (CT4)
1. Operate the hydraulic system for five minutes.
2. Remove the quick disconnect plug and install a 0-100 bar (0-600 psi) pressure gauge.
3. Remove the plug from the end of the valve to expose the adjusting screw.
4. With the engine running, tilt the platform
fully forward
using the fore/aft level switch.
5. While holding the level switch forward, set the pressure to 13 bar (500 psi) maximum by slowly turning the
adjusting screw, clockwise increases pressure.
6. Replace the valve plug.
7. Remove the gauge and reinstall the plug.
8. Level the platform.
1. Main Relief Valve
2. Overcentre Valves
3. Lift Coil
4. Steering Relief Valve
5. Test Port
6. Manual Brake Release Pump
1
2
3
4
5
1. Operate the hydraulic system 10 to 15 minutes
to warm the oil.
2. Remove the cap or loosen the locknut on the
Main Relief Valve.
3. Install a 0-250 bar (
0-3000 psi
) pressure gauge
to the gauge port.
4. Select
LIFT
mode and elevate the machine fully.
5. While holding the Chassis Lift Button, adjust the
Main Relief Valve until the pressure gauge
reads 172 bar (
2500 psi
).
6. Release the Chassis Lift Button.
7. Replace the cap, or tighten the locknut on the
Lift Relief Valve, and torque to 8N-m (
6 ft-lbs
).
8. Lower the platform.
6
Summary of Contents for SL-26
Page 1: ...POWERED ACCESS WORK PLATFORM SL26 30 SERVICE PARTS MANUAL ...
Page 2: ......
Page 24: ...Specifications 2 17 ...
Page 46: ...4 6 4 Troubleshooting Notes ...
Page 48: ...5 2 5 Schematics 5 2 ELECTRICAL SCHEMATIC Hydraulic Schematic ...
Page 49: ...5 3 5 Schematics 5 3 CABLE ASSEMBLY J1 ...
Page 50: ...5 4 5 Schematics 5 4 J1 CABLE SCHEMATIC ...
Page 51: ...5 5 5 Schematics 5 5 CABLE ASSEMBLY J2 ...
Page 52: ...5 6 5 Schematics 5 6 CABLE SCHEMATIC J2 ...
Page 53: ...5 7 5 Schematics 1 2 14 29 27 28 5 26 25 18 19 5 5 HYDRAULIC SCHEMATIC ...
Page 57: ...6 4 6 Illustrated Part List Chassis Assembly 505001 000 ...
Page 58: ...6 5 6 Illustrated Part List Elevating Assembly ...
Page 61: ...6 8 6 Illustrated Part List Platform Assembly 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ...
Page 63: ...6 10 6 Illustrated Part List Platform Assembly Slide out Section ...
Page 67: ...6 14 6 Illustrated Part List Hydraulic Valve Block ...
Page 69: ...6 16 6 Illustrated Part List Engine Assembly ...
Page 74: ...6 21 6 Illustrated Part List Hydraulic Assembly ...
Page 78: ...6 25 6 Illustrated Part List ...
Page 79: ...6 26 6 Illustrated Part List Decal Assembly ...
Page 80: ...6 27 6 Illustrated Part List Decal Kit EN SL30SL 505506 000 ...
Page 83: ...6 30 6 Illustrated Part List ...
Page 84: ...6 31 6 Illustrated Part List ...
Page 85: ......