background image

 

 

 

 

 

 

FOLDARM90 

 

 

 

 

 

 

 

INSTALLATION 

MANUAL

 

 

Summary of Contents for FOLDARM90

Page 1: ...FOLDARM90 INSTALLATION MANUAL...

Page 2: ...assistance from another person to install gate arms Removal and replacement of the gate arm pole is much simpler with two people Always use appropriate PPE during installation including safety glasses...

Page 3: ...Set Wrenches Acetone 100 Silicone Glue Rubber Bands Pencil Sharpie NOTE First time installations will require one INSTKIT GATE with LED Controller sold separately LED Strip Folding 1 Retainer Clips 4...

Page 4: ...f Offset Plate with Hole 1 For left side installation Align top left hole of Offset Plate with Hole 1 2 2 Measure 3 down from the center of Hole 1 and mark the measurement for Hole 2 2 3 Measure 2 lef...

Page 5: ...he operator as shown below with hardware included in kit Tighten securely Repeat for Hole 2 and Hole 3 2 6 Determine the operator arm s clearance Measure the height from the top of the operator s outp...

Page 6: ...on 2nd Section Length 6 unless necessary to cut it 3 2 Attach 1st arm section to the operator s arm bracket as shown below Tighten securely and repeat with second bracket bolt NOTE Do not use nylon nu...

Page 7: ...to the Arm Height length minus 2 NOTE Prior to making any cuts pre install a nut on the rod to be used as a tool to clean the burrs and smooth out the cut 3 8 Install the rod nuts on both ends of the...

Page 8: ...zontal position desired 3 12 On the back side of the Threaded Rod take a pencil or sharpie and put it through the eye of the threaded rod end facing the offset plate It may help to wrap the pencil wit...

Page 9: ...the offset plate Keep the pencil perpendicular to the arm and as centered as possible within the Threaded Rod End eye 3 15 Drill a inch hole through the center of the marked cross on the offset plate...

Page 10: ...threaded rod end and tighten all securely 3 17 Insert 2nd section of the barrier arm into Pivot Bracket 3 18 Drill hole on underside of arm and attach to the Pivot Bracket with a 6 screw 3 19 Ensure...

Page 11: ...s 4 3 Slide the 1st section of the LED strip the part BEFORE the 10 elbow wire into the 1st arm section the side connected to operator bracket NOTE this section of the LED strip CANNOT be cut since it...

Page 12: ...www GateArms com support GateArms com 786 339 9840 Patent Pending 2020 Gate Arms All Rights Reserved Manual Rev 2020 05 FOLDARM90...

Reviews: