24
Fully lower both main booms, flick boom and ensure that the basket is level.
Ensure that the tele boom is fully retracted and that the bottom boom is
located in the front Boom Prop, making the boom down switch.
By alternating from front to rear, carefully
inch up
each pair of
Outriggers until all four Outriggers are fully retracted, and the road wheels
are in contact with the ground.
Now fully raise the outriggers until they are in the stowed position.
Switch off the platform and ensure all loose items/covers are secure before
leaving
the
unit.
STOWING THE MACHINE
SECTION
M
Summary of Contents for AB48 HSRT
Page 2: ......
Page 4: ...2 NOTES...
Page 9: ...7 WORKING ENVELOPE SECTION C m m Height in Meters Distance in Meters...
Page 29: ...27 NOTES...
Page 30: ......
Page 31: ......